Process of Tegal Alur Retention Basin Construction Reaches 70 Percent
access_time November 10 2020 08:05 PM remove_red_eye 1070
Reported by Rudi Hermawan | Translated by Maria Inggita
Reported by Rudi Hermawan | Translated by Maria Inggita
Tegal Alur Retention Basin construction in Kalideres, West Jakarta has reached 70 percent.
This retention basin is made to overcome inundation in Lokbin Tegal Alur due to local rain and tidal flood
West Jakarta Water Resources (SDA) Sub-agency's Flood Control Maintenance System for Clean Water and Wast
ewater Section Head, Wawan conveyed, this retention basin is as wide as 2,410 square meters and depth of 3 meters on 3,640 square meters land."This retention basin is made to overcome inundation in Lokbin Tegal Alur due to local rain and tidal flood," he said, Tuesday (11/10).
Retention Basin Construction in Tegal Alur is Expected to Overcome InundationAccording to him, this retention walls can accommodate up to 7,230 cubic meters water to prepare for water runoff from Semongol River or tidal flood.
"We have started the construction since September and targeted it to finish in December," he closed.