You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Tegal Alur Sudah Mencapai 70 Persen
.
photo Rudi Hermawan - Beritajakarta.id

Process of Tegal Alur Retention Basin Construction Reaches 70 Percent

Tegal Alur Retention Basin construction in Kalideres, West Jakarta has reached 70 percent.

This retention basin is made to overcome inundation in Lokbin Tegal Alur due to local rain and tidal flood

West Jakarta Water Resources (SDA) Sub-agency's Flood Control Maintenance System for Clean Water and Wastewater Section Head, Wawan conveyed, this retention basin is as wide as 2,410 square meters and depth of 3 meters on 3,640 square meters land.

"This retention basin is made to overcome inundation in Lokbin Tegal Alur due to local rain and tidal flood," he said, Tuesday (11/10).

Retention Basin Construction in Tegal Alur is Expected to Overcome Inundation

According to him, this retention walls can accommodate up to 7,230 cubic meters water to prepare for water runoff from Semongol River or tidal flood.

"We have started the construction since September and targeted it to finish in December," he closed.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye795 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye780 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye479 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye377 personBudhi Firmansyah Surapati
  5. 104 Wild Cats in Kebayoran Lama Sterilized

    access_time07-11-2024 remove_red_eye348 personTiyo Surya Sakti