You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Embung Tegal Alur Sudah Mencapai 70 Persen

Process of Tegal Alur Retention Basin Construction Reaches 70 Percent

Tegal Alur Retention Basin construction in Kalideres, West Jakarta has reached 70 percent.

This retention basin is made to overcome inundation in Lokbin Tegal Alur due to local rain and tidal flood

West Jakarta Water Resources (SDA) Sub-agency's Flood Control Maintenance System for Clean Water and Wastewater Section Head, Wawan conveyed, this retention basin is as wide as 2,410 square meters and depth of 3 meters on 3,640 square meters land.

"This retention basin is made to overcome inundation in Lokbin Tegal Alur due to local rain and tidal flood," he said, Tuesday (11/10).

Retention Basin Construction in Tegal Alur is Expected to Overcome Inundation

According to him, this retention walls can accommodate up to 7,230 cubic meters water to prepare for water runoff from Semongol River or tidal flood.

"We have started the construction since September and targeted it to finish in December," he closed.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye784 personFakhrizal Fakhri
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  3. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye417 personAldi Geri Lumban Tobing
  4. Jakarta Newcomers Mostly in Productive Age

    access_time22-04-2026 remove_red_eye382 personAldi Geri Lumban Tobing
  5. East Jakarta Steps Up Services to Simplify Population Registration

    access_time20-04-2026 remove_red_eye348 personNurito