You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Kolam Retensi di Rorotan Rampung Desember
.
photo Budhi Firmansyah Surapati - Beritajakarta.id

Long Storage Canal Construction in Rorotan Targeted to Finish in December

North Jakarta Water Resources (SDA) Sub-agency builds long storage canal on Jalan Babek TNI, RW 10, Rorotan, Cilincing.

Our target is to finish it in December

Its construction is started from October and targeted to finish in this December.

Cilincing SDA Sub-district Unit Head, Cahyo Budi Setiawan conveyed, his side planned to build long storage canal with length of 400 meters and depth of 6 meters in front of Komplek TNI Babek, RW 10, Rorotan.

City Prepares Centralized Domestic Wastewater Management System

"This cannal will be used to connect drainage from RW 04 and RW 10 Rorotan before it flows into PHB channel," he said, Wednesday (11/11).

According to him, water from long storage canal will flow into PHB channel along 1.3 kilometers in Nusa Kiran residential area, RW 12 and 13, Rorotan. Then, water will flow to Blencong River before being discharged into the sea.

At the same time, his side also drained PHB channel that connects long storage into Blencong River. Long storage canal construction is expected to overcome inundation in several RWs in Rorotan and Cakung Timur.

"Now, we only need to connect it with Blencong River a little more. Our target is to finish it in December," he mentioned.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1221 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1056 personAldi Geri Lumban Tobing
  3. First Jakarta Update Talks Nataru up to Water Tariff Adjustment

    access_time24-12-2024 remove_red_eye915 personDessy Suciati
  4. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye911 personAldi Geri Lumban Tobing
  5. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye737 personFolmer