You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Dam Waduk Rawa Malang Di target Rampung Desember

Rawa Malang Reservoir Construction Work in Cilincing Begins

We will finish it within 1.5 months or precisely in the upcoming December

The North Jakarta Water Resources (SDA) Sub-agency starts to develop the Rawa Malang Reservoir on a7.8-hectare land belongs to Jakarta SDA Agency in RW 10, Semper Timur, Cilincing.

Cilincing Sub-district Executing Unit Head Cahyono Budi Setiawan said, as the initial stage, the work begins with the construction of the reservoir boundary DAM. This reservoir is planned to have a shape like a shoe.

5 Pumps and 35 SDA Personnel Deployed to Handle Inundation in Cilincing

"We will finish it within 1.5 months or precisely in the upcoming December," he expressed, Tuesday (11/10).

He explained it aims to overcome inundation during the rainy season. The reservoir itself would have five meters depth with 1.5 meters height.

Besides being a flood control system, the reservoir also functions as a water storage to increase groundwater sources in the surrounding area. Then it is also designed to be one of the ecotourism spots in North Jakarta.

"People can travel, sports and other activities. Near the location, there is also Malang City Swamp Forest. So the facilities are more complete," he stated.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1094 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye577 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye503 personNurito
  4. Jakarta Light Festival Dazzles Visitors at Kota Tua

    access_time22-06-2026 remove_red_eye494 personBudhi Firmansyah Surapati
  5. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye481 personAldi Geri Lumban Tobing