You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran Air 9 RW se Kelurahan Sunter Agung Dikebut

Drains Dredging Work in Sunter Agung Accelerated

The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13

The drains dredging work in eight RWs in Sunter Agung, Tanjung Priok, North Jakarta continues to be accelerated. It is targeted to be complete in the forthcoming December.

Sunter Agung Urban Village Head Danang Wijanarka said its dredging work involved personnel of the North Jakarta Water Resources (SDA) Sub-agency assisted by PPSU members.

826 Gutters in Central Jakarta have Been Repaired

"The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13," he expressed, Tuesday (11/17).

He explained it had been ongoing since October. Every day, personnel managed to collect 120 sacks containing mud and waste from the drains.

Those eight RWs consisted of RW 03, 06, 07, 08, 10, 16 and 18. In a day, the mud transported from the drains reached 400 cubic meters.

"Hopefully it can be finished by the end of this year thus can maximally handle flooding," he hoped.

Linked News
Popular News indeks
  1. Jakarta Announces Rp 1 Fare for Transjakarta, MRT, and LRT on August 17

    access_time13-08-2026 remove_red_eye979 personAldi Geri Lumban Tobing
  2. Jakarta Assesses Needs and Coordinates Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye684 personAldi Geri Lumban Tobing
  3. 21 Parking Locations Prepared for Indonesian Independence Day Celebrations

    access_time15-08-2026 remove_red_eye656 personAldi Geri Lumban Tobing
  4. Jakarta Prepares Aid for NTT Earthquake Victims

    access_time16-08-2026 remove_red_eye642 personDessy Suciati
  5. Pramono: Independence must Be Manifested Through Concrete Action

    access_time17-08-2026 remove_red_eye635 personDessy Suciati