You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran Air 9 RW se Kelurahan Sunter Agung Dikebut

Drains Dredging Work in Sunter Agung Accelerated

The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13

The drains dredging work in eight RWs in Sunter Agung, Tanjung Priok, North Jakarta continues to be accelerated. It is targeted to be complete in the forthcoming December.

Sunter Agung Urban Village Head Danang Wijanarka said its dredging work involved personnel of the North Jakarta Water Resources (SDA) Sub-agency assisted by PPSU members.

826 Gutters in Central Jakarta have Been Repaired

"The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13," he expressed, Tuesday (11/17).

He explained it had been ongoing since October. Every day, personnel managed to collect 120 sacks containing mud and waste from the drains.

Those eight RWs consisted of RW 03, 06, 07, 08, 10, 16 and 18. In a day, the mud transported from the drains reached 400 cubic meters.

"Hopefully it can be finished by the end of this year thus can maximally handle flooding," he hoped.

Linked News
Popular News indeks
  1. Water Channel on Jalan SPG 7 Being Improved

    access_time18-09-2026 remove_red_eye819 personNurito
  2. Jakarta Govt Fully Backs Kanye West's Ye Live in Jakarta 2026

    access_time16-09-2026 remove_red_eye648 personDessy Suciati
  3. Jakarta Pushes to Strengthen Food Ecosystem

    access_time18-09-2026 remove_red_eye587 personAldi Geri Lumban Tobing
  4. Pramono Departs for New York to Discuss Climate and Food Crises

    access_time18-09-2026 remove_red_eye515 personDessy Suciati
  5. Operations of the MV Doulos Hope Ship Library Delayed

    access_time18-09-2026 remove_red_eye511 personAnita Karyati