You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran Air 9 RW se Kelurahan Sunter Agung Dikebut

Drains Dredging Work in Sunter Agung Accelerated

The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13

The drains dredging work in eight RWs in Sunter Agung, Tanjung Priok, North Jakarta continues to be accelerated. It is targeted to be complete in the forthcoming December.

Sunter Agung Urban Village Head Danang Wijanarka said its dredging work involved personnel of the North Jakarta Water Resources (SDA) Sub-agency assisted by PPSU members.

826 Gutters in Central Jakarta have Been Repaired

"The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13," he expressed, Tuesday (11/17).

He explained it had been ongoing since October. Every day, personnel managed to collect 120 sacks containing mud and waste from the drains.

Those eight RWs consisted of RW 03, 06, 07, 08, 10, 16 and 18. In a day, the mud transported from the drains reached 400 cubic meters.

"Hopefully it can be finished by the end of this year thus can maximally handle flooding," he hoped.

Linked News
Popular News indeks
  1. Jakarta Council Begins Deliberations on New Population and Housing Bylaws

    access_time21-08-2026 remove_red_eye1883 personFakhrizal Fakhri
  2. Pramono Vows to Prioritize Jakarta’s Strategic Development

    access_time22-08-2026 remove_red_eye833 personDessy Suciati
  3. Pramono Commends Madurese Community for Their Vital Role in Building Jakarta

    access_time19-08-2026 remove_red_eye681 personDessy Suciati
  4. New LRT Jakarta Route Set for Official Launch on August 26

    access_time22-08-2026 remove_red_eye447 personDessy Suciati
  5. Jakarta Agrees on Rp79.59T Revised 2026 Budget Framework

    access_time21-08-2026 remove_red_eye428 personFakhrizal Fakhri