You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran Air 9 RW se Kelurahan Sunter Agung Dikebut

Drains Dredging Work in Sunter Agung Accelerated

The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13

The drains dredging work in eight RWs in Sunter Agung, Tanjung Priok, North Jakarta continues to be accelerated. It is targeted to be complete in the forthcoming December.

Sunter Agung Urban Village Head Danang Wijanarka said its dredging work involved personnel of the North Jakarta Water Resources (SDA) Sub-agency assisted by PPSU members.

826 Gutters in Central Jakarta have Been Repaired

"The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13," he expressed, Tuesday (11/17).

He explained it had been ongoing since October. Every day, personnel managed to collect 120 sacks containing mud and waste from the drains.

Those eight RWs consisted of RW 03, 06, 07, 08, 10, 16 and 18. In a day, the mud transported from the drains reached 400 cubic meters.

"Hopefully it can be finished by the end of this year thus can maximally handle flooding," he hoped.

Linked News
Popular News indeks
  1. North Jakarta KPKP Ensures Sacrificial Meat is Safe for Consumption

    access_time27-05-2026 remove_red_eye852 personAnita Karyati
  2. Jakarta Government Hosts Jakarta Sales Mission in China

    access_time25-05-2026 remove_red_eye743 personAldi Geri Lumban Tobing
  3. Commission E Pushes for Evaluation of Free Private School Program

    access_time25-05-2026 remove_red_eye732 personFakhrizal Fakhri
  4. Dharma Jaya Supports Jakarta PWNU Qurban Program

    access_time27-05-2026 remove_red_eye721 personAldi Geri Lumban Tobing
  5. Transjakarta Adjusts Services During Eid al-Adha

    access_time26-05-2026 remove_red_eye611 personAldi Geri Lumban Tobing