You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran Air 9 RW se Kelurahan Sunter Agung Dikebut

Drains Dredging Work in Sunter Agung Accelerated

The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13

The drains dredging work in eight RWs in Sunter Agung, Tanjung Priok, North Jakarta continues to be accelerated. It is targeted to be complete in the forthcoming December.

Sunter Agung Urban Village Head Danang Wijanarka said its dredging work involved personnel of the North Jakarta Water Resources (SDA) Sub-agency assisted by PPSU members.

826 Gutters in Central Jakarta have Been Repaired

"The sub-agency personnel are intensified in eight RWs and PPSU members are in two RW 09 and 13," he expressed, Tuesday (11/17).

He explained it had been ongoing since October. Every day, personnel managed to collect 120 sacks containing mud and waste from the drains.

Those eight RWs consisted of RW 03, 06, 07, 08, 10, 16 and 18. In a day, the mud transported from the drains reached 400 cubic meters.

"Hopefully it can be finished by the end of this year thus can maximally handle flooding," he hoped.

Linked News
Popular News indeks
  1. Rano Reaffirms Jakarta's Vision of Becoming a City of Cinema

    access_time22-10-2026 remove_red_eye5530 personBudhi Firmansyah Surapati
  2. Drainage Channels Along Two Rawajati Roads Dredged

    access_time21-10-2026 remove_red_eye1865 personTiyo Surya Sakti
  3. Check Saturday's Traffic Diversions for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye864 personAldi Geri Lumban Tobing
  4. MRT Jakarta Prolongs Weekend Service for Kanye West Concert

    access_time23-10-2026 remove_red_eye764 personAldi Geri Lumban Tobing
  5. MRT Jakarta Modifies Schedule for Jakarta Running Festival

    access_time23-10-2026 remove_red_eye732 personAldi Geri Lumban Tobing