You don't have javascript enabled. Good luck with that.
Pencarian
Sumur Resapan Komunal Dibangun di RW 08 Kecamatan Matraman

Two Communal Infiltration Wells Built in Matraman

This is the initial stage and we target to build 100 wells this year

Two communal infiltration wells have been built on the yard of the Al-Hidayah Musala, Jalan Pengayoman, RT 08/08, Utan Kayu Utara, Matraman. It is done to accommodate water in large quantities that can be utilized by locals.

Matraman Sub-district Head Andriansyah explained it was the result of collaboration with one of the banks through the Corporate Social Responsibility (CSR) program.

Nine Infiltration Wells Built at RW 01 Untung Jawa Island

"This is the initial stage and we target to build 100 wells this year," he expressed, Tuesday (11/17).

He explained, those wells were made in a diameter of 1.2 meters and 2 meters depth. In the middle of them, there was a pipe measuring 4 inches with 20 meters depth.

"Thus far every well can be completed in two to three days," he said.

He exclaimed the land used to build the well itself was in an existing infiltration well, but had been deepened.

"One well can accommodate rainwater from 10 residents' houses," he stated.

Linked News
Popular News indeks
  1. 129 Motorcycle Parked Illegally in Daan Mogot Controlled

    access_time08-11-2026 remove_red_eye762 personBudhi Firmansyah Surapati
  2. BPBD Prepares 403 Evacuation Sites to Mitigate Floods in Jakarta

    access_time08-11-2026 remove_red_eye534 personBudhi Firmansyah Surapati
  3. BI and Jakarta Government Deepen Investment, Creative Economy Collaboration

    access_time09-11-2026 remove_red_eye530 personAldi Geri Lumban Tobing
  4. Pramono Launches JEKATE Running 2026, Promotes Healthy Living

    access_time08-11-2026 remove_red_eye513 personDessy Suciati
  5. Tourism and Creative Economy Boost Jakarta's Economic Growth

    access_time08-11-2026 remove_red_eye471 personDessy Suciati