You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Nakertrans dan Energi Jakpus Siagakan Genset di Lokasi Pengungsian
.
photo istimewa - Beritajakarta.id

Anticipating Flood, Central Jakarta Nakertrans and Energy Provides 6 Generator Sets

Central Jakarta Empowerment, Transmigration (Nakertrans) and Energy Agency prepared 6 generator sets with high capacity to fulfill electricity needs in flood shelter points if needed.

We make sure those 6 generator sets in prime condition and ready to use when needed

Central Jakarta Nakertrans and Energy Head, Fidiyah Rokhim said, his side prepared 6 generator sets with capacity 10 Kilovolt Ampere (KVA), 80 KVA, and 100 KVA.

"We make sure those 6 generator sets in prime condition and ready to use when needed," he asserted, Saturday (11/28).

Central Jakarta Nakertrans and Energy Holds Online Cooking Class

His side also provided 2 spotlights as anticipation of flood in the area.

"Moreover, we also prepared personnel that can immediately be deployed to the location to assist residents affected by floods," he explained.

Linked News
Popular News indeks
  1. Most Residents Satisfied with Pramono-Rano's Performance

    access_time25-06-2025 remove_red_eye312 personDessy Suciati
  2. Pramono Ensures KJP will Continue to Be Distributed

    access_time26-06-2025 remove_red_eye308 personDessy Suciati
  3. No Car Free Day on June 29 to Support Jakarta International Marathon 2025

    access_time24-06-2025 remove_red_eye282 personAldi Geri Lumban Tobing
  4. 19,675 People Visit Ragunan Zoo on Islamic New Year

    access_time27-06-2025 remove_red_eye271 personTiyo Surya Sakti
  5. Here are Parking Spaces around Lapangan Banteng for Jakarta's Anniversary

    access_time21-06-2025 remove_red_eye270 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik