You don't have javascript enabled. Good luck with that.
Pencarian
Sudin Nakertrans dan Energi Jakpus Siagakan Genset di Lokasi Pengungsian
.
photo istimewa - Beritajakarta.id

Anticipating Flood, Central Jakarta Nakertrans and Energy Provides 6 Generator Sets

Central Jakarta Empowerment, Transmigration (Nakertrans) and Energy Agency prepared 6 generator sets with high capacity to fulfill electricity needs in flood shelter points if needed.

We make sure those 6 generator sets in prime condition and ready to use when needed

Central Jakarta Nakertrans and Energy Head, Fidiyah Rokhim said, his side prepared 6 generator sets with capacity 10 Kilovolt Ampere (KVA), 80 KVA, and 100 KVA.

"We make sure those 6 generator sets in prime condition and ready to use when needed," he asserted, Saturday (11/28).

Central Jakarta Nakertrans and Energy Holds Online Cooking Class

His side also provided 2 spotlights as anticipation of flood in the area.

"Moreover, we also prepared personnel that can immediately be deployed to the location to assist residents affected by floods," he explained.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik