You don't have javascript enabled. Good luck with that.
Pencarian
25 Satgas SDA Perbaiki Turap Longsor Kali Cipinang di CBS mo

25 SDA Personnel Repair Collapsed Retaining Wall in Cipinang Besar Selatan

Total 15 Water Resources (SDA) Task Force personnel were deployed to repair the collapsed Cipinang River's retaining wall at RW 02, Cipinang Besar Selatan (CBS), Jatinegara, East Jakarta.

We target it to finish by the end of March

Jatinegara Sub-district SDA Task Force Coordinator, Tamrizal said, this retaining wall with length of 33 meters and height of 2.5 meters was collapsed due to heavy rain and high water discharge in Cipinang River on February 28.

This repair was carried out manually by installing stones along 30 meters and 2.5 meters high. It was installed for temporarily to anticipate further landslide.

Sunter River Retaining Wall Repair Targeted to Finish in Mid-March

"Personnel have handled it since two weeks ago. We target it to finish by the end of March," he stated.

According to him, personnel on the field didn't find any problems in handling landslide in Cipinang River.

"We have enough material to repair it. Hopefully we can complete it within this month," he closed.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1088 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye571 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye489 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye473 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye470 personBudhi Firmansyah Surapati