You don't have javascript enabled. Good luck with that.
Pencarian
Sepanjang Maret, 2.695 Titik Jalan Rusak di Jaktim Telah Diperbaiki

2,695 Damaged Road Points Repaired in East Jakarta

In March 2021, East Jakarta Bina Marga Sub-agency repaired 2.695 damaged road points in 10 sub-districts.

Particularly, we repair major roads at night thus it will not disrupt the traffic

East Jakarta Bina Marga Sub-agency's Road and Bridge Section Head, Ilham Raya stated, his side repaired 2,695 damaged road points which covered an area of 8,653.12 square meters on March 1-15. This repair was carried out on collector roads, connecting roads, and major roads.

"Particularly, we repair major roads at night thus it will not disrupt the traffic," he mentioned, Tuesday (3/16).

12 Damaged Road Points Repaired in West Jakarta

According to him, 188 Bina Marga Task Force personnel in 10 sub-districts and sub-agency were deployed to repair the damaged road points every day.

Those damaged road points were located on Jl. D.I. Panjaitan Jatinegara, Jl. M.T. Haryono Cawang, Jl. Raya Bogor, Jl. Komplek Griya of Tipar Cakung Public Housing, Jl. Raya Penggilingan and Jl. Komarudin.

"So far there is no obstacles in repair those roads. When it rains, we postpone the repair work until it gets sunny again to ensure our work is optimal," he said.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye357 personAldi Geri Lumban Tobing
close