You don't have javascript enabled. Good luck with that.
Pencarian
 254.16 meter Perrsegi Jalan Rusak di Palmerah Telah Ditambal

160 Damaged Road Points Repaired in Palmerah

In January-March period, as many as 160 damaged roads in Palmerah Sub-district, West Jakarta have been repaired using cold mix or cold asphalt.

In total, we use 468 sacks of cold mix to repair 254.16 square meters or 160 damaged road points

Palmerah Sub-district Bina March Unit Head, Made Widhi stated, several parts of roads were damaged because of excessive vehicle tonnage and inundation, especially when heavy rain falls.

13 Potholes on Jalan MT Haryono Have Been Repaired

"In total, we use 468 sacks of cold mix to repair 254.16 square meters or 160 damaged road points," he explained, Monday (3/29).

In details, his side repaired 73.96 square meters in January, 176.04 square meters in February, and 4.16 square meters in March.

This repair is expected to make road users to feel more safe and comfortable when using the road. He also asked that public facilities in properly maintained.

"After it is repaired, we hope people can take care of it," he asserted.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye751 personFakhrizal Fakhri
  2. Jakarta Regional Budget Spending Reaches Rp10.38 Trillion in Q1

    access_time17-04-2026 remove_red_eye697 personDessy Suciati
  3. Job Absorption Rises in Jakarta

    access_time17-04-2026 remove_red_eye598 personDessy Suciati
  4. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye590 personTiyo Surya Sakti
  5. Training and Certification Boost Tourism Workforce Competitiveness

    access_time17-04-2026 remove_red_eye573 personAldi Geri Lumban Tobing