You don't have javascript enabled. Good luck with that.
Pencarian
Capai 90 Persen Pembangunan Kampung Jepang Ditargetkan Rampung Bulan Juni
.
photo Suparni - Beritajakarta.id

Japanese Village Construction Progress in Sakura Beach Touches 90 Percent

Currently, the construction progress of Japanese Village, one of tourist attractions in Sakura Beach, Untung Jawa Urban Village, South Thousand Islands Sub-agency, has touched 90 percent.

All construction work is targeted to be completed in June

Untung Jawa Urban Village Head, Supriyadi conveyed, in this project, his side has built kiosks, gate, connecting roads, and selfie spot which connected to Sakura Beach.

"All construction work is targeted to be completed in June," he stated, Tuesday (4/20).

Sakura Beach Area on Untung Jawa Island Undergoes Arrangement

According to him, there are several remaining works, such as gazebo construction and other additional equipment to beautify the existing buildings.

"Hopefully it can increase number of tourists thus it can boost local economy," he mentioned.

For information, Japanese Village is built through collaboration between Thousand Islands Regency and PT. Pertamina Hulu Energi Offshore North West Jakarta (PHE ONWJ) and PT. Pertamina Patra Niaga through Corporate Social Responsibility (CSR) program.

Linked News
Popular News indeks
  1. Tanah Abang SDA Taskforce Normalizes Channels in Two Locations

    access_time12-05-2025 remove_red_eye466 personFolmer
  2. Community Work Held to Clean Environment in Petamburan

    access_time11-05-2025 remove_red_eye359 personFolmer
  3. Food Station Signs Farming Contracts in Rorotan

    access_time12-05-2025 remove_red_eye303 personAldi Geri Lumban Tobing
  4. Commission D Supports Construction of Rorotan Rusunawa

    access_time10-05-2025 remove_red_eye261 personFakhrizal Fakhri
  5. Pramono Focuses on Increasing Equal Access to Education

    access_time15-05-2025 remove_red_eye256 personDessy Suciati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik