You don't have javascript enabled. Good luck with that.
Pencarian
Capai 90 Persen Pembangunan Kampung Jepang Ditargetkan Rampung Bulan Juni

Japanese Village Construction Progress in Sakura Beach Touches 90 Percent

Currently, the construction progress of Japanese Village, one of tourist attractions in Sakura Beach, Untung Jawa Urban Village, South Thousand Islands Sub-agency, has touched 90 percent.

All construction work is targeted to be completed in June

Untung Jawa Urban Village Head, Supriyadi conveyed, in this project, his side has built kiosks, gate, connecting roads, and selfie spot which connected to Sakura Beach.

"All construction work is targeted to be completed in June," he stated, Tuesday (4/20).

Sakura Beach Area on Untung Jawa Island Undergoes Arrangement

According to him, there are several remaining works, such as gazebo construction and other additional equipment to beautify the existing buildings.

"Hopefully it can increase number of tourists thus it can boost local economy," he mentioned.

For information, Japanese Village is built through collaboration between Thousand Islands Regency and PT. Pertamina Hulu Energi Offshore North West Jakarta (PHE ONWJ) and PT. Pertamina Patra Niaga through Corporate Social Responsibility (CSR) program.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1378 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye1006 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye837 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye644 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye624 personAldi Geri Lumban Tobing