You don't have javascript enabled. Good luck with that.
Pencarian
Penumpang Tiba di Terminal Kalideres Jalani Tes Swab
....
photo istimewa - Beritajakarta.id

Passengers who Arrived at Kalideres Terminal Directed to Take Swab Test

Kalideres Intercity and Interprovincial (AKAP) Bus Terminal, West Jakarta, has required passengers who have just arrived at the terminal to take rapid antigen (swab) test.

Passengers who have just arrived are immediately directed to Health Post to take swab test

Kalideres AKAP Bus Terminal Head, Revi Zulkarnaen mentioned, until Monday (5/17) morning, 95 passengers who had just arrived at terminal immediately underwent rapid antigen test. His side found two of them were tested positive for COVID-19.

"Passengers who have just arrived are immediately directed to Health Post to take swab test. From the results, two passengers who arrived at Kalideres Terminal on Sunday (5/16) are tested positive for COVID-19," he informed, Monday (5/17).

Transjakarta Bus Operating Hours Adjusted During Eid Holiday

His side immediately sterilized bus that carrying passengers who tested positive for COVID-19.

"Passengers who tested positive for COVID-19 are immediately referred to Kalideres Health Center for PCR test. If PCR test result is confirmed positive, they will be referred to Wisma Atlet Kemayoran," he stated.

His side urged bus crews not to drop off passengers outside the terminal to ensure passengers' health.

"We ask bus crews to obedient in dropping passengers off at terminal. We also instruct our personnel to implement strict health protocols such as wearing mask, gloves, maintaining safe distance, and so on," he said.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye393 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye389 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye346 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye321 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye314 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik