You don't have javascript enabled. Good luck with that.
Pencarian
Saluran di Jalan Flamboyan Mulai Dipasang U-dith
.
photo Wuri Setyaningsih - Beritajakarta.id

Channel Repair on Jl. Flamboyan Kebon Jeruk Has Reached 80 Percent

West Jakarta Water Resources (SDA) Sub-agency is currently repaired water channel on Jl. Flamboyan, Kebon Jeruk, by installing it with U-ditch and covers.

Our target is to complete it by the end of June

West Jakarta SDA Sub-agency Drainage Maintenance Section Head, Wawan Kurniawan mentioned, U-ditch and covers installation work has been carried out since June 12, 2021.  

"U-ditch and channel covers will be installed on channel along 80 meters with width 60 centimeters," he informed, Thursday (6/24).

Channel on Jalan Merpati in Meruya Utara Widened

His side deployed 1 unit mini excavator and 13 personnel equipped with hoes, crowbars, sledgehammers, hammers, and buckets.

"Current progress has reached 80 percent. Our target is to complete it by the end of June," he said.

He hopes this repair can optimize water channel capacity thus it can minimize inundation, especially during heavy rains.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye544 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing