You don't have javascript enabled. Good luck with that.
Pencarian
aluran di Jalan Kelapa Puan Raya Dinormalisasi
.
photo Suparni - Beritajakarta.id

Channel on Jalan Kelapa Puan Raya is Normalized

Kelapa Gading Sub-district Water Resources (SDA) Unit, North Jakarta normalized channel on Jalan Kelapa Puan Raya, Block EF, RT 09/13, Kelapa Gading Timur Urban Village.

Channel dredging and elevation work which started on September 1, 2021 is targeted to be completed on September 30

Kelapa Gading SDA Unit Head, Citrin Indriyarti conveyed, channel normalization was carried out along 209 meters by dredging garbage and mud sedimentation from the channel.

"Currently, we have dredged about 100 meters long. We deploy 10 personnel to dredge it," she explained, Friday (9/10).

Kesatriaan Reservoir Normalization is Being Conducted

In this normalization work, her side not only dredged the channel, but also increase the height if channel's sheet pile from 40 centimeters to 80 centimeters with width of 45 centimeters.

"There are 8 personnel who elevate the sheet pile and now it has been carried out around 5 meters," she added.

During dredging the channel, there were problems with crossing channel which burried in soil and number of utilities cables that attached to channel which causing blockages.

"We will restore the function of crossing channel which buried in soil thus it can be used to overcome inundation in the area. Channel dredging and elevation work which started on September 1, 2021 is targeted to be completed on September 30," she said.

Linked News
Popular News indeks
  1. Transjakarta Officially Opens School for Bus Drivers

    access_time20-11-2024 remove_red_eye1036 personAldi Geri Lumban Tobing
  2. Acting Governor Teguh: Coastal Seawall Construction Begins in 2025

    access_time20-11-2024 remove_red_eye902 personFolmer
  3. Legislator Ahmad Lukman Jupiter Wants PT FSTJ Add Shop Cars

    access_time19-11-2024 remove_red_eye544 personDessy Suciati
  4. PMPTSP Agency Launches PIN Greenvest to Prompt Green and Sustainable Investment

    access_time21-11-2024 remove_red_eye446 personAldi Geri Lumban Tobing
  5. Transjakarta Extends its Operation to 11 PM Today

    access_time19-11-2024 remove_red_eye379 personAldi Geri Lumban Tobing