You don't have javascript enabled. Good luck with that.
Pencarian
Dua Alat Berat Keruk Embung Pekayon
....
photo Nurito - Beritajakarta.id

Two Heavy Equipment Deployed to Dredge Pekayon Retention Basin

Two heavy equipment consisting of long arm and amphibious dredger were deployed by East Jakarta Water Resources (SDA) Sub-agency to dredge Pekayon Retention Basin (Embung) in Pekayon Urban Village, Pasar Rebo.

Dredging is carried out with varying depths between 3-5 meters

East Jakarta SDA Sub-agency's Maintenance Section Head, Puryanto conveyed, Pekayon Retention Basin which covers an area around two hectares had been dredged since two and a half months ago. The work is targeted to be completed next month.

"Dredging is carried out with varying depths between 3-5 meters, thus retention basin has more capacity to hold water discharge," he explained, Wednesday (9/15).

Retention Basin Construction at Lokbin Tegal Alur Public Housing is Completed

According to him, mud and soil which dredged from the location will be used to build inspection road on the sides of retention basin.

Moreover, his side will also build embankment to restrain and control water flow that leads to Gongseng connecting (Phb) channel.

"We take this step as an effort to anticipate flooding in Pekayon area," he said.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye554 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye446 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye309 personBudhi Firmansyah Surapati
  4. Jakartans Invited to Participate in HPSN 2025 Event

    access_time21-02-2025 remove_red_eye301 personAldi Geri Lumban Tobing
  5. 41 Wild Cats in Cikoko Sterilized

    access_time21-02-2025 remove_red_eye295 personTiyo Surya Sakti