You don't have javascript enabled. Good luck with that.
Pencarian
Penanganan Genangan di Jalan Pangeran Jayakarta Terus Dituntaskan
....
photo istimewa - Beritajakarta.id

Flood Handling Work on Jalan Pangeran Jayakarta is Accelerated

Flood handling work on Jalan Pangeran Jayakarta, Mangga Dua Selatan Urban Village, Sawah Besar, Central Jakarta, is accelerated until the end of this year.

The purpose to build retention basin is to hold water when heavy rain falls

Central Jakarta Assistant for Economic and Development, Bakwan Ferizan Ginting said, after constructing retention basin (embung) as wide as 600 square meters which completed in early May, Jakarta Water Resources (SDA) Agency will build a crossing that connects retention basin with Ciliwung River's tributary.

"We will build crossing channel on Jalan Pangeran Jayakarta to connect retention basin with Ciliwung River's tributary," he mentioned, Wednesday (5/26).

Central Jakarta will Build Green Open Space in ITC Cempaka Mas

He is optimistic that retention basin and channel crossing construction will solve flood problems on Jalan Pangeran Jayakarta.

"The purpose to build retention basin is to hold water when heavy rain falls. Later on, retention basin will be drained out to Ciliwung River's tributary," he explained.

Linked News
Popular News indeks
  1. Monas Prepares to Greet Visitors This Eid Holiday

    access_time30-03-2025 remove_red_eye687 personDessy Suciati
  2. Jakarta Vice Governor Rano Wishes a Happy Eid al-Fitr 1446 Hijri

    access_time31-03-2025 remove_red_eye600 personFolmer
  3. Foul Smell Around JGC Clarified Not Coming from Rorotan RDF

    access_time28-03-2025 remove_red_eye437 personAldi Geri Lumban Tobing
  4. Odd-Even Policy in Jakarta Put on Hold for Eid Break

    access_time28-03-2025 remove_red_eye322 personAldi Geri Lumban Tobing
  5. 49,101 Local and Foreign Tourists Swarm Monas

    access_time02-04-2025 remove_red_eye274 personBudhi Firmansyah Surapati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik