You don't have javascript enabled. Good luck with that.
Pencarian
Penanganan Genangan di Jalan Pangeran Jayakarta Terus Dituntaskan

Flood Handling Work on Jalan Pangeran Jayakarta is Accelerated

Flood handling work on Jalan Pangeran Jayakarta, Mangga Dua Selatan Urban Village, Sawah Besar, Central Jakarta, is accelerated until the end of this year.

The purpose to build retention basin is to hold water when heavy rain falls

Central Jakarta Assistant for Economic and Development, Bakwan Ferizan Ginting said, after constructing retention basin (embung) as wide as 600 square meters which completed in early May, Jakarta Water Resources (SDA) Agency will build a crossing that connects retention basin with Ciliwung River's tributary.

"We will build crossing channel on Jalan Pangeran Jayakarta to connect retention basin with Ciliwung River's tributary," he mentioned, Wednesday (5/26).

Central Jakarta will Build Green Open Space in ITC Cempaka Mas

He is optimistic that retention basin and channel crossing construction will solve flood problems on Jalan Pangeran Jayakarta.

"The purpose to build retention basin is to hold water when heavy rain falls. Later on, retention basin will be drained out to Ciliwung River's tributary," he explained.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close