You don't have javascript enabled. Good luck with that.
Pencarian
Penanganan Genangan di Jalan Pangeran Jayakarta Terus Dituntaskan

Flood Handling Work on Jalan Pangeran Jayakarta is Accelerated

Flood handling work on Jalan Pangeran Jayakarta, Mangga Dua Selatan Urban Village, Sawah Besar, Central Jakarta, is accelerated until the end of this year.

The purpose to build retention basin is to hold water when heavy rain falls

Central Jakarta Assistant for Economic and Development, Bakwan Ferizan Ginting said, after constructing retention basin (embung) as wide as 600 square meters which completed in early May, Jakarta Water Resources (SDA) Agency will build a crossing that connects retention basin with Ciliwung River's tributary.

"We will build crossing channel on Jalan Pangeran Jayakarta to connect retention basin with Ciliwung River's tributary," he mentioned, Wednesday (5/26).

Central Jakarta will Build Green Open Space in ITC Cempaka Mas

He is optimistic that retention basin and channel crossing construction will solve flood problems on Jalan Pangeran Jayakarta.

"The purpose to build retention basin is to hold water when heavy rain falls. Later on, retention basin will be drained out to Ciliwung River's tributary," he explained.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1661 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye666 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye468 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye425 personDessy Suciati
  5. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye396 personDessy Suciati