You don't have javascript enabled. Good luck with that.
Pencarian
Penanganan Genangan di Jalan Pangeran Jayakarta Terus Dituntaskan
....
photo istimewa - Beritajakarta.id

Flood Handling Work on Jalan Pangeran Jayakarta is Accelerated

Flood handling work on Jalan Pangeran Jayakarta, Mangga Dua Selatan Urban Village, Sawah Besar, Central Jakarta, is accelerated until the end of this year.

The purpose to build retention basin is to hold water when heavy rain falls

Central Jakarta Assistant for Economic and Development, Bakwan Ferizan Ginting said, after constructing retention basin (embung) as wide as 600 square meters which completed in early May, Jakarta Water Resources (SDA) Agency will build a crossing that connects retention basin with Ciliwung River's tributary.

"We will build crossing channel on Jalan Pangeran Jayakarta to connect retention basin with Ciliwung River's tributary," he mentioned, Wednesday (5/26).

Central Jakarta will Build Green Open Space in ITC Cempaka Mas

He is optimistic that retention basin and channel crossing construction will solve flood problems on Jalan Pangeran Jayakarta.

"The purpose to build retention basin is to hold water when heavy rain falls. Later on, retention basin will be drained out to Ciliwung River's tributary," he explained.

Linked News
Popular News indeks
  1. Heru Budi Hartono Named Top BUMD Trustee 2024

    access_time23-03-2024 remove_red_eye1247 personFolmer
  2. Jakarta Quickly Handles Inundation

    access_time22-03-2024 remove_red_eye1041 personAldi Geri Lumban Tobing
  3. Jakarta IMM: Heru's Achievements Become an Inspiration for Jakarta's Young People

    access_time24-03-2024 remove_red_eye852 personNurito
  4. Heru Calls on Jakarta Residents to Anticipate DHF Cases

    access_time26-03-2024 remove_red_eye746 personFolmer
  5. To Overcome Flooding, City Deploys Personnel and Pumps

    access_time22-03-2024 remove_red_eye637 personAldi Geri Lumban Tobing