You don't have javascript enabled. Good luck with that.
Pencarian
Penanganan Genangan di Jalan Pangeran Jayakarta Terus Dituntaskan
....
photo istimewa - Beritajakarta.id

Flood Handling Work on Jalan Pangeran Jayakarta is Accelerated

Flood handling work on Jalan Pangeran Jayakarta, Mangga Dua Selatan Urban Village, Sawah Besar, Central Jakarta, is accelerated until the end of this year.

The purpose to build retention basin is to hold water when heavy rain falls

Central Jakarta Assistant for Economic and Development, Bakwan Ferizan Ginting said, after constructing retention basin (embung) as wide as 600 square meters which completed in early May, Jakarta Water Resources (SDA) Agency will build a crossing that connects retention basin with Ciliwung River's tributary.

"We will build crossing channel on Jalan Pangeran Jayakarta to connect retention basin with Ciliwung River's tributary," he mentioned, Wednesday (5/26).

Central Jakarta will Build Green Open Space in ITC Cempaka Mas

He is optimistic that retention basin and channel crossing construction will solve flood problems on Jalan Pangeran Jayakarta.

"The purpose to build retention basin is to hold water when heavy rain falls. Later on, retention basin will be drained out to Ciliwung River's tributary," he explained.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye795 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye779 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye478 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye374 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye334 personTP Moan Simanjuntak