You don't have javascript enabled. Good luck with that.
Pencarian
Dua Alat Berat Keruk Embung Pekayon

Two Heavy Equipment Deployed to Dredge Pekayon Retention Basin

Two heavy equipment consisting of long arm and amphibious dredger were deployed by East Jakarta Water Resources (SDA) Sub-agency to dredge Pekayon Retention Basin (Embung) in Pekayon Urban Village, Pasar Rebo.

Dredging is carried out with varying depths between 3-5 meters

East Jakarta SDA Sub-agency's Maintenance Section Head, Puryanto conveyed, Pekayon Retention Basin which covers an area around two hectares had been dredged since two and a half months ago. The work is targeted to be completed next month.

"Dredging is carried out with varying depths between 3-5 meters, thus retention basin has more capacity to hold water discharge," he explained, Wednesday (9/15).

Retention Basin Construction at Lokbin Tegal Alur Public Housing is Completed

According to him, mud and soil which dredged from the location will be used to build inspection road on the sides of retention basin.

Moreover, his side will also build embankment to restrain and control water flow that leads to Gongseng connecting (Phb) channel.

"We take this step as an effort to anticipate flooding in Pekayon area," he said.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1419 personFolmer
  2. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye857 personAldi Geri Lumban Tobing
  3. Commemorating Vesak, Jakarta Lights Up with Illumination of Jakarta 2026

    access_time30-05-2026 remove_red_eye653 personBudhi Firmansyah Surapati
  4. Seniors Participate in Pasti Bisa Berkarya at MRT Stations

    access_time02-06-2026 remove_red_eye603 personAldi Geri Lumban Tobing
  5. Krendang Fire Victims Receive Proper Support and Assistance

    access_time29-05-2026 remove_red_eye477 personBudhi Firmansyah Surapati