You don't have javascript enabled. Good luck with that.
Pencarian
Dua Alat Berat Keruk Embung Pekayon

Two Heavy Equipment Deployed to Dredge Pekayon Retention Basin

Two heavy equipment consisting of long arm and amphibious dredger were deployed by East Jakarta Water Resources (SDA) Sub-agency to dredge Pekayon Retention Basin (Embung) in Pekayon Urban Village, Pasar Rebo.

Dredging is carried out with varying depths between 3-5 meters

East Jakarta SDA Sub-agency's Maintenance Section Head, Puryanto conveyed, Pekayon Retention Basin which covers an area around two hectares had been dredged since two and a half months ago. The work is targeted to be completed next month.

"Dredging is carried out with varying depths between 3-5 meters, thus retention basin has more capacity to hold water discharge," he explained, Wednesday (9/15).

Retention Basin Construction at Lokbin Tegal Alur Public Housing is Completed

According to him, mud and soil which dredged from the location will be used to build inspection road on the sides of retention basin.

Moreover, his side will also build embankment to restrain and control water flow that leads to Gongseng connecting (Phb) channel.

"We take this step as an effort to anticipate flooding in Pekayon area," he said.

Linked News
Popular News indeks
  1. Pram-Rano Attend Bung Karno Festival at Proklamasi Park

    access_time20-06-2026 remove_red_eye1090 personFolmer
  2. JIS-Ancol Integrated Infrastructure Officially Activated

    access_time23-06-2026 remove_red_eye573 personDessy Suciati
  3. Free Cake-Making Training Held at RPTRA Mustika Ratu

    access_time23-06-2026 remove_red_eye499 personNurito
  4. Metropolitan City Rally 2026 to Be Held at City Hall

    access_time19-06-2026 remove_red_eye476 personAldi Geri Lumban Tobing
  5. Rano Officially Opens Discover Betawi Art and Culture 2026

    access_time19-06-2026 remove_red_eye474 personBudhi Firmansyah Surapati