You don't have javascript enabled. Good luck with that.
Pencarian
Dua Alat Berat Keruk Embung Pekayon

Two Heavy Equipment Deployed to Dredge Pekayon Retention Basin

Two heavy equipment consisting of long arm and amphibious dredger were deployed by East Jakarta Water Resources (SDA) Sub-agency to dredge Pekayon Retention Basin (Embung) in Pekayon Urban Village, Pasar Rebo.

Dredging is carried out with varying depths between 3-5 meters

East Jakarta SDA Sub-agency's Maintenance Section Head, Puryanto conveyed, Pekayon Retention Basin which covers an area around two hectares had been dredged since two and a half months ago. The work is targeted to be completed next month.

"Dredging is carried out with varying depths between 3-5 meters, thus retention basin has more capacity to hold water discharge," he explained, Wednesday (9/15).

Retention Basin Construction at Lokbin Tegal Alur Public Housing is Completed

According to him, mud and soil which dredged from the location will be used to build inspection road on the sides of retention basin.

Moreover, his side will also build embankment to restrain and control water flow that leads to Gongseng connecting (Phb) channel.

"We take this step as an effort to anticipate flooding in Pekayon area," he said.

Linked News
Popular News indeks
  1. BMKG: Sunny to Cloudy Skies Forecast Across Jakarta Today

    access_time11-09-2026 remove_red_eye1655 personDessy Suciati
  2. Jakarta Reallocates Funds for Rp 250M Suckermouth Catfish Study After Pramono’s Direct Order

    access_time10-09-2026 remove_red_eye666 personFakhrizal Fakhri
  3. Jakarta Swift Response to Volcanic Ash Helps Narrow Areas with High PM10

    access_time08-09-2026 remove_red_eye468 personAldi Geri Lumban Tobing
  4. Pramono Urges Jakmania to Keep Jakarta Safe

    access_time11-09-2026 remove_red_eye423 personDessy Suciati
  5. Pramono Endorses Five-City Tour for Jazz Goes to Campus

    access_time12-09-2026 remove_red_eye392 personDessy Suciati