You don't have javascript enabled. Good luck with that.
Pencarian
Dinas Bina Marga Pastikan Pompa di Underpass Berkondisi Prima

Bina Marga Ensures All Pumps in Underpasses are in Prime Condition

Facing rainy season, Jakarta Bina Marga Agency ensures 67 water pumps in 15 underpasses are in prime condition and ready to operate.

We control underpass water pumps in 15 locations

Jakarta Bina Marga Agency Head, Hari Nugroho mentioned, each underpass has around 3-6 water pumps with different capacities.

"We control underpass water pumps in 15 locations. We have ensured them to be ready to use and in great condition. As soon as there is a puddle, the pump will immediately drain it," he explained, Thursday (10/21).

Pinang Ranti PPSU Members Instructed to Fix Pump Before Flood Arrives

According to him, water pump is very crucial in preventing flood and inundation when heavy rain falls. Therefore, it needs routine maintenance. His side is also quick to repair if there is broken pumps.

"We have anticipated it by carrying out routine maintenance and repairing the pumps. Thus when it rains, all pumps in 15 underpasses are ready to operate," he stated.

His side can adjust pump operation according to rain intensity and flood water in underpass.

"It can be set by operating three pumps, while one pump is on standby. However, when it rains heavily and flood water is high, we will operate all the pumps," he closed.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye956 personAldi Geri Lumban Tobing
  2. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye680 personAldi Geri Lumban Tobing
  3. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye573 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye553 personAldi Geri Lumban Tobing
  5. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye503 personFolmer