You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Saluran Air di Jl Kunci Kayu Putih Rampung
....
photo Nurito - Beritajakarta.id

Broken Channel on Jalan Kunci Kayu Putih Repaired

This is a follow-up to the residents' proposal through the Musrenbang

After passing through a long repair for 75 days, the 502-meter length water channel located on Jalan Kunci, RW 02 Kayu Putih, Pulogadung, East Jakarta is finally functioning again.

Drainage Development and Improvement Division Head, Tengku Saugi Zikri said, the channel was previously broken and could not accommodate rainwater maximally. As a result, it caused flooding when it rained.

Collapsed Sheet Pile on Jalan Kramat Kwitang Nomor 9 Being Repaired

"The repair was done a week ago. This is a follow-up to the residents' proposal through the Musrenbang," he stated, Friday (10/22).

Kayu Putih Urban Village Head, Tuti Sugihastuti added, it couldn't work at all due to a lot of sedimentation.

"Residents then proposed repair through the Musrenbang since five years ago in a row and finally it is realized now," she concluded.

Linked News
Popular News indeks
  1. 1,262 Personnel Ready to Support Bhayangkara Anniversary Cleanliness

    access_time30-06-2025 remove_red_eye564 personAldi Geri Lumban Tobing
  2. UK Royal Marine Band Enlivens Jakarta Anniversary

    access_time27-06-2025 remove_red_eye547 personDessy Suciati
  3. 19,675 People Visit Ragunan Zoo on Islamic New Year

    access_time27-06-2025 remove_red_eye460 personTiyo Surya Sakti
  4. Transjakarta Wins Award for Best GCG Company

    access_time27-06-2025 remove_red_eye384 personAldi Geri Lumban Tobing
  5. Video Mapping and Dancing Fountain Entertain Monas Visitors

    access_time27-06-2025 remove_red_eye383 personBudhi Firmansyah Surapati

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik