You don't have javascript enabled. Good luck with that.
Pencarian
Normalisasi Saluran Turap Longsor di Jalan Kramat Kwitang

Collapsed Sheet Pile on Jalan Kramat Kwitang Nomor 9 Being Repaired

Some 20 officers and excavators from Central Jakarta Water Resources (SDA) Sub-agency has started repairing the collapsed sheet pile of the water channel on Jalan Kramat Kwitang Number 9, Kwitang Urban Village, Senen Sub-district.

Thus far it has touched 40 percent and is targeted to be complete next week

Central Jakarta SDA's Maintenance Division Head, Achmad Daeroby said, the sheet pile was collapsed after being hit by a landslide due to the theft of underground cables by irresponsible people.

"Indeed a lot of utility cables under these sidewalks and channels. We fixed it by reinstalling the u-ditch," he expressed, Tuesday (10/12).

Collapsed Sheet Pile in Rawa Baboon Ciracas Being Repaired

According to him, it was carried out by installing a u-ditch measuring 80 centimeters long, 60 centimeters wide and 120 centimeters high. It was also elevated around 1.15 meters high.

"Thus far it has touched 40 percent and is targeted to be complete next week," he stated.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye935 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye823 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye651 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye512 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye505 personAldi Geri Lumban Tobing