Channel on Jalan Tebet Timur Dalam VIII Dredged
access_time November 15 2021 11:10 PM remove_red_eye 785
Reported by TP Moan Simanjuntak | Translated by Maria Inggita
Reported by TP Moan Simanjuntak | Translated by Maria Inggita
Total 12 PPSU personnel were deployed to dredge channel and remove weeds on Jalan Tebet Timur Dalam VIII, RT 07/09, Tebet Timur Urban Village, Tebet Sub-district, South Jakarta.
In this rainy season, channel needs to be normalized to optimize its function
Tebet Timur Urban Village Head, Siti Fauziah Ghozali stated, this activity was carried out because silting made the channel unable to accommodate rainwater optimally.
"In this rainy season, channel needs to be normalized to optimize its function, especially when heavy rain falls. It is one of our efforts to minimize inundation," he conveyed, Monday (11/15).
Dredging Work on Channel from Jalan Panti Asuhan Cipinang CompletedAccording to him, this channel has length of 50 meters, width of 50 meters and depth of 20 centimeters.
"PPSU personnel also remove weeds around the location thus the area looks cleaner and neater," he mentioned.