You don't have javascript enabled. Good luck with that.
Pencarian
Keruk Saluran Penghubung Cilangkap, Sudin SDA Kerahkan Satu Alat Berat
....
photo Nurito - Beritajakarta.id

SDA Deploys One Heavy Equipment to Dredge Cilangkap Phb Channel

East Jakarta Water Resources (SDA) Sub-agency deployed one amphibious excavator to dredge mud in Cilangkap Connecting (Phb) Channel. This dredging work has been carried out since October 2021 and now the progress reaches about 10 percent.

Currently, we have dredged along 260 meters or around 10 percent of total length 2.643 meters

East Jakarta SDA Sub-agency Maintenance Section Head, Puryanto stated, his side dredged this 2,643-meter Phb channel to overcome inundation that often occurs in Cilangkap and Setu. Dredging work is carried out within different depths between 1-1.5 meters.

"Currently, we have dredged along 260 meters or around 10 percent of total length 2.643 meters," he informed, Thursday (1/6).

South Jakarta SDA Prepares 13 Mobile Pumps to Anticipate Flooding

According to him, this dredging work is started from downstream which is located across TNI AD Pusterad on Jl. Raya Setu-Cilangkap to upstream around Giri Kencana Cilangkap Reservoir.

"Because we only deploy 1 heavy equipment, we cannot confirm when it will be completed," he mentioned.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1505 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye925 personAldi Geri Lumban Tobing
  3. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye392 personFolmer
  4. BMKG Warns of Potential High Rainfall in Jakarta

    access_time22-01-2025 remove_red_eye390 personDessy Suciati
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye367 personTiyo Surya Sakti