You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Kepulauan Seribu Lakukan Perawatan Tanggul Pulau Untung Jawa

Thousand Islands SDA Repairs Untung Jawa Island Embankment

The Thousand Islands Water Resources (SDA) Sub-agency personnel are carrying out maintenance on the Untung Jawa Island embankment located in the RPTRA Amiterdam, Untung Jawa Island Urban Village, South Thousand Islands Sub-district.

We have deployed 6 personnel to plaster the embankment

Thousand Islands SDA Sub-agency Head, Hendri conveyed, his side would plaster embankment wall as long as 19.25 meters and floor with 1.4 meters in width.

"We have deployed 6 personnel to plaster the embankment," he said, Wednesday (3/2).

Temporary Embankment on Semongol Riverbank Being Built to Prevent Flooding

According to him, the work which began on February 19 was carried out to repair parts of embankment floor and wall that were damaged.

"We are repairing it to beautify and make it more comfortable for tourists who use it as a jogging track. It is targeted to be completed this month," he stated.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye1069 personAldi Geri Lumban Tobing
  2. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye1006 personDessy Suciati
  3. Pramono: Transjabodetabek Fare Adjustment Based on Careful Consideration

    access_time10-06-2026 remove_red_eye983 personDessy Suciati
  4. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye770 personAldi Geri Lumban Tobing
  5. Accelerating Jakarta`s Global City Development, Pramono Inaugurates Urban Knowledge Hub

    access_time08-06-2026 remove_red_eye655 personDessy Suciati