You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Saluran Baru di Kelurahan Pulau Tidung Rampung

Construction of New Channels in Tidung Island Urban Village Completed

The Seribu Islands Water Resources (SDA) Sub-agency has completed the construction of water and crossing channels complete with a drainage control, locally known as bak control in RT 01/02 and 04/04, Tidung Island Urban Village, South Seribu Island Sub-district.

Hopefully, it can accommodate more volume of water and flow faster, including can overcome inundation

Seribu Islands SDA Sub-agency Head, Hendri expressed these channels have 64 meters in length. They were built to maximally anticipate puddles during heavy rains.

"The work started in February and was completed on Sunday (2/27)," he added, Monday (2/28).

This Weekend, Channel Dredging Work in Kalibaru Timur Completed

By so, it was expected to accommodate water in large quantities to overcome the inundation that previously often occurred in the area.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye711 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye596 personTiyo Surya Sakti
  3. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye534 personAldi Geri Lumban Tobing
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye498 personFakhrizal Fakhri
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye487 personAnita Karyati