You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran Air di Jalan Kesehatan Capai 70 Persen

Channel Dredging on Jalan Kesehatan Has Reached 70 Percent

The channel dredging work through 49 workers that has been carried out since February on Jalan Kesehatan I to X, RW 06 Petojo Selatan Urban Village, Gambir, Central Jakarta has reached 70 percent.

If it is ignored, it will trigger inundation

Gambir Sub-district Water Resources (SDA) Unit Head Muhammad Imawan mentioned that the channel was dredged to follow up on residents' requests through Musrenbang 2021 since mud thickness had reached 70 centimeters.

"If it is ignored, it will trigger inundation," he conveyed, Tuesday (3/29).

Five Sacks of Mud and Garbage Collected from Drain on Kelapa Island

According to him, the channel from Jalan Kesehatan I to X has a length of 10,000 meters with an average width of 80 centimeters and a height of one meter.

"We have finished the dredging in the channel along Jalan Kesehatan I to V. While from Jalan Kesehatan IV to X is estimated to be completed in mid-April," he said.

It was done manually using simple tools such as a hoe, crowbar, cart, and plastic sack.

"So far, we have transported about 50 cubic meters of mud," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1094 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye994 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye950 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye725 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye625 personAnita Karyati