You don't have javascript enabled. Good luck with that.
Pencarian
Rel KA Rawan Lonsor Akibat Banjir PT KAI Siapkan Petugas Pengawas

PT KAI Officers on Standby for Anticipating Landslide

Due to it is already rainy season, PT Kereta Api Indonesia (KAI) has deployed officers at railway crossings in a bid to anticipate landslide. 

To anticipate landslide, we have sent officers in the field for 24 hours

Senior Manager of Corporate Communication for Jakarta PT KAI Daops I, Bambang Prayitno disclosed besides inundating railway crossings, rain water also often leads to landslide and corrosion.

In West Jakarta for instance, the inundation and landslide are often happened in some railway crossings, such as Pesing Koneng, Kedoya Utara, Kebon Jeruk, and Rawa Buaya-Kalideres.

Flyovers to Be Built above Permata Hijau and Kuningan Railway Crossings

"To anticipate landslide, we have sent officers in the field for 24 hours," he expressed, Monday (1/25).

Moreover, he disclosed, his party is still focusing on turn-railway track at the Pesing Koneng railway crossing as long as 50 meters.

"We do it to anticipate train trip disruptions. Additionally, we also prepare officers for 24 hours at railway crossings which are prone to landslide," he disclosed.

Linked News
Popular News indeks
  1. Transjakarta Adjusts Operations Due to Public Demonstration

    access_time12-06-2026 remove_red_eye2003 personAldi Geri Lumban Tobing
  2. BTN JAKIM 2026, Traffic Engineering and Alternative Routes Provided

    access_time11-06-2026 remove_red_eye918 personAldi Geri Lumban Tobing
  3. BTN JAKIM 2026: Pramono Invites Everyone to Have Fun While Running

    access_time13-06-2026 remove_red_eye815 personFakhrizal Fakhri
  4. Cipete Selatan Steps Up Waste Management at the Source

    access_time12-06-2026 remove_red_eye730 personTiyo Surya Sakti
  5. Malaka Sari Fire Survivors Receive Assistance

    access_time12-06-2026 remove_red_eye562 personNurito