Cinta Bridge Revitalization on Tidung Island Resumed
Reported by Anita Karyati | Translated by Nugroho Adibrata
The Seribu Islands Regency administration is about to resume the revitalization of the Cinta Bridge on Tidung Island, South Seribu Islands next week.
I will check every two weeks to make sure it is running on time
Seribu Islands Regent, Junaedi said this bridge revitalization is a follow-up activity in 2022, which is still halfway done. In total, it would be carried out up to 200 meters long.
"This bridge is a tourist icon of Tidung Island. I want it to be done well and on time, thus locals can enjoy it," he expressed, Monday (6/12).
Hundreds of Trees Planted in Cinta Park, Tidung Island
He even urged the development executer to always maintain the quality of work in accordance with predetermined specifications.
"I will check every two weeks to make sure it is running on time," he asserted.
Seribu Islands UKT 2 Head, Sofyan explained the further revitalization will begin in mid-June and is targeted to be completed in December 2023.
"We'll resume the repair of this bridge to 480 meters long with a contract period of the next six months," he said.