You don't have javascript enabled. Good luck with that.
Pencarian
 Enam Titik Jalan Rusak di Tiga Kelurahan  di Jakbar Diperbaiki
.
photo TP Moan Simanjuntak - Beritajakarta.id

Bina Marga Sub-Agency Repairs Six Damaged Roads in West Jakarta

The West Jakarta Bina Marga Sub-agency repaired six roads in three sub-districts.

It is done to follow up on residents' reports vua CRM application

Road and Bridge Section Head, Khairul Imam expressed the repair was done to create a sense of safe and comfort for the road users.

"It is done to follow up on residents' reports vua CRM application and monitoring officer results in the field," he expressed, Sunday (10/1).

Five Bridges on Jalan Menteng Tenggulun Being Repaired

Those six roads in repair were three spots on Jalan Pesing Poglar, RT 04/02, Kedaung Angke River, Cengkareng Sub-district near the Water Pump House measuring two meters long and one meter wide.

Then one spot was at Jalan Panjang or near Transjakarta Bus Stop, Kedoya Utara Urban Village, Kebon Jeruk Sub-district along two meters with one meter wide.

While two spots were at Jalan Puri Kembangan, precisely in front of Kedoya Garden Housing Complex along two meters and one meter wide.

He added six personnel were deployed to conduct repairs, where it was executed by patching damaged road sections using asphalt.

"Hopefully, it will make people more comfort when they pasa the road," he hoped.

Linked News
Popular News indeks
  1. 250 High School Students in N. Jakarta Learn to Create Digital Content

    access_time01-11-2024 remove_red_eye793 personBudhi Firmansyah Surapati
  2. W. Jakarta SDA Constructs Channel on Jalan Nurul Muslimin I Kembangan

    access_time04-11-2024 remove_red_eye772 personTP Moan Simanjuntak
  3. 18 School Principals Participate in Public Agency E-Monev Presentation

    access_time02-11-2024 remove_red_eye474 personFolmer
  4. Tanah Tinggi Residents Participate in Computer Operator Training

    access_time02-11-2024 remove_red_eye373 personBudhi Firmansyah Surapati
  5. Semongol River Dredging Intensified

    access_time06-11-2024 remove_red_eye323 personTP Moan Simanjuntak