You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Bangun Sumur Resapan di Pulau Harapan
....
photo Anita Karyati - Beritajakarta.id

More Biopores Built to Minimize Flooding on Harapan Island

The Seribu Islands Water Resources (SDA) Sub-agency has again built an infiltration well and two biopore holes at RT 05/01, Harapan Island, North Seribu Islands.

This aims to minimize inundation when it rains

Harapan Island SDA Sub-agency Coordinator, Ganda expressed that the infiltration well and biopore hole construction has been ongoing since Friday (9/29). It involved three personnel.

"It is one of the best possible solutions to flooding," he expressed, Monday (10/2).

Infiltration Wells and Biopore Holes in Pramuka Island Cleaned Up

He explained the infiltration well would have a diameter of 30x30 centimeters with a depth of up to 50 centimeters, while the biopore holes would have a width of 35 centimeters using a four-inch pipe.

"Overall, there are 69 spots of wells on Harapan Island spread across three RWs," he explained.

Harapan Island Urban Village Head, Muhammad Yusup appreciated the SDA personnel who were active, fast, and neat in building infiltration wells and biopore holes in his region.

"Hopefully, it can speed up rainwater infiltration," he stated.

Linked News
Popular News indeks
  1. Deputy Gov Rano: Meat Stocks Secured Up to Ramadhan

    access_time22-02-2025 remove_red_eye402 personBudhi Firmansyah Surapati
  2. Jakarta to Hold Cheap Food Bazaar at 193 Locations

    access_time22-02-2025 remove_red_eye320 personBudhi Firmansyah Surapati
  3. Pramono - Rano Expected to Realize Better Resident Welfare

    access_time20-02-2025 remove_red_eye301 personBudhi Firmansyah Surapati
  4. Batu Ampar and Induk River Connecting Channels Dredged

    access_time16-02-2025 remove_red_eye284 personNurito
  5. Jakarta Commits to Realizing National Waste Management Pilot Project

    access_time17-02-2025 remove_red_eye265 personFolmer