You don't have javascript enabled. Good luck with that.
Pencarian
Tanggul Pemecah Gelombang Sisi Utara Pulau Kelapa Diperbaiki

Collapsed Breakwater on Kelapa Island Repaired

The Seribu Islands Water Resources (SDA) Sub-agency is seen repairing the collapsed breakwater after being hit by high tide on the north side of RT 01/02, Kelapa Island, North Seribu Islands.

The work progress has touched 15 meters

Seribu Islands SDA Sub-agency Head, Hendri said the breakwater repair was carried out by reassembling the collapsed hollow cubes using nylon rope.

"These massive cubes have been falling since last October. We put them back together and tied them with slings, thus they are strong enough to withstand sea waves," he expressed, Thursday (11/9).

Breakwater on North Side of Panggang Island Being Repaired

He explained the cube installation involved six personnel equipped with one unit of heavy equipment. The breakwater along 127 meters will be completed in the forthcoming December 2023.

"The work progress has touched 15 meters. Hopefully, it can protect the island from abrasion," he stated.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye936 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye824 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye652 personAldi Geri Lumban Tobing
  4. JITEX 2026: Fostering a Global Trade and Investment Ecosystem

    access_time01-09-2026 remove_red_eye512 personAldi Geri Lumban Tobing
  5. Transjakarta Commits to Accelerating Modal Integration and Fleet Electrification

    access_time31-08-2026 remove_red_eye506 personAldi Geri Lumban Tobing