You don't have javascript enabled. Good luck with that.
Pencarian
Tanggul Pemecah Gelombang Sisi Utara Pulau Kelapa Diperbaiki

Collapsed Breakwater on Kelapa Island Repaired

The Seribu Islands Water Resources (SDA) Sub-agency is seen repairing the collapsed breakwater after being hit by high tide on the north side of RT 01/02, Kelapa Island, North Seribu Islands.

The work progress has touched 15 meters

Seribu Islands SDA Sub-agency Head, Hendri said the breakwater repair was carried out by reassembling the collapsed hollow cubes using nylon rope.

"These massive cubes have been falling since last October. We put them back together and tied them with slings, thus they are strong enough to withstand sea waves," he expressed, Thursday (11/9).

Breakwater on North Side of Panggang Island Being Repaired

He explained the cube installation involved six personnel equipped with one unit of heavy equipment. The breakwater along 127 meters will be completed in the forthcoming December 2023.

"The work progress has touched 15 meters. Hopefully, it can protect the island from abrasion," he stated.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye740 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye618 personTiyo Surya Sakti
  3. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye565 personAldi Geri Lumban Tobing
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye526 personFakhrizal Fakhri
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye504 personAldi Geri Lumban Tobing