You don't have javascript enabled. Good luck with that.
Pencarian
Tanggul Pemecah Gelombang Sisi Utara Pulau Kelapa Diperbaiki

Collapsed Breakwater on Kelapa Island Repaired

The Seribu Islands Water Resources (SDA) Sub-agency is seen repairing the collapsed breakwater after being hit by high tide on the north side of RT 01/02, Kelapa Island, North Seribu Islands.

The work progress has touched 15 meters

Seribu Islands SDA Sub-agency Head, Hendri said the breakwater repair was carried out by reassembling the collapsed hollow cubes using nylon rope.

"These massive cubes have been falling since last October. We put them back together and tied them with slings, thus they are strong enough to withstand sea waves," he expressed, Thursday (11/9).

Breakwater on North Side of Panggang Island Being Repaired

He explained the cube installation involved six personnel equipped with one unit of heavy equipment. The breakwater along 127 meters will be completed in the forthcoming December 2023.

"The work progress has touched 15 meters. Hopefully, it can protect the island from abrasion," he stated.

Linked News
Popular News indeks
  1. Jakarta to Hold Citywide Lights-Out Initiative

    access_time24-04-2026 remove_red_eye778 personAldi Geri Lumban Tobing
  2. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye661 personTiyo Surya Sakti
  3. Jakarta Residents Welcome Rp1 Public Transport Fare

    access_time24-04-2026 remove_red_eye570 personNurito
  4. Limiting Gadget Use in Schools Expected to Boost Interaction and Reading Habits

    access_time24-04-2026 remove_red_eye552 personFakhrizal Fakhri
  5. Rano Leads Parking Arrangement on Jalan R.A. Kartini, Lebak Bulus

    access_time24-04-2026 remove_red_eye548 personBudhi Firmansyah Surapati