You don't have javascript enabled. Good luck with that.
Pencarian
Personel Gabungan Atasi Longsor di Cijantung

Joint Personnel Handle Landslide in Cijantung

As many as 10 joint personnel handled collapsed plaster of Connecting Channel on Jalan Swadaya RT 07/06 Cijantung, Pasar Rebo, East Jakarta, Wednesday (1/31).

We try to handle it by cleaning the debris

Cijantung Urban Village Head Teguh Suharyono, said the collapsed plaster also made the road collapsed by one meter depth and 50 cm width.

Cipete Selatan PPSU Personnel Alerted in Flood-Prone Areas

"We try to handle it by cleaning the debris," he said.

He added that the debris also blocked the channel. It is afraid will cause inundation when rain pours.

"Next step will be handled by SDA personnel by installing dolken wood," he added.

Hasan (45), local resident, admitted the collapsed plaster happened at 3 AM during heavy rain last night. There was no victim in the incident since the road is quiet.

"We put big pots as sign for road users," he admitted.

Linked News
Popular News indeks
  1. Transjakarta Resumes Operations with Strategic Service Adjustments

    access_time28-08-2026 remove_red_eye883 personAldi Geri Lumban Tobing
  2. Jakarta Deploys 120 Personnel to Counteract Traffic Disruption for Today’s Protests

    access_time27-08-2026 remove_red_eye802 personAldi Geri Lumban Tobing
  3. JIF Summit 2026 Drives Global Partnerships and Investment Growth in Jakarta

    access_time28-08-2026 remove_red_eye627 personAldi Geri Lumban Tobing
  4. Drainage Normalization on Jalan Mandioli to Be Completed in October

    access_time28-08-2026 remove_red_eye469 personFolmer
  5. Kali Sekretaris Pedestrian Bridge Repairs in Duri Kepa Completed

    access_time28-08-2026 remove_red_eye453 personBudhi Firmansyah Surapati