You don't have javascript enabled. Good luck with that.
Pencarian
Pembangunan Empat Sumur Resapan di Pulau Tidung Rampung Lusa

Four Infiltration Wells in Tidung Island to Complete Soon

The construction of infiltration wells at residential on Jalan Lapangan Sepak Bola, RT 03/04, Tidung Island Urban Village, Seribu Selatan Island Sub-district is targeted to complete Friday (2/9).

inundation can be minimized

Seribu Island Water Resources Sub-agency Head, Hendri, said the construction is being accelerated to avoid inundation in the area. It is because the rain intensity is high lately.

"The construction is our respond to RW's request since the existing infiltration well is too far. That is why the area is often inundated," he said, Wednesday (2/7).

Puddle on Jalan Gunawarman Quickly Recedes

The infiltration wells are connected each other. The construction involve 11 personnel of Pasukan Biru.

According to him, the wells can be functioned to reserve water during dry season.

"I hope local resident will take care the well much and inundation can be minimized too," he added.

Meanwhile, RT 03 Head, Moh Dais, appreciated and thanked the sub-agency for responding the construction request.

"It is hoped the construction can be completed soon," he stated.

Linked News
Popular News indeks
  1. May Day: Transjakarta Service Adjustments

    access_time01-05-2026 remove_red_eye825 personAldi Geri Lumban Tobing
  2. Dinkes Sets Up Health Posts for May Day Events

    access_time01-05-2026 remove_red_eye575 personDessy Suciati
  3. City Deploys Massive Cleanup Force for May Day at Monas

    access_time01-05-2026 remove_red_eye568 personAldi Geri Lumban Tobing
  4. The Lights-Out Action Successfully Reduces Carbon Emissions

    access_time27-04-2026 remove_red_eye564 personAldi Geri Lumban Tobing
  5. MRT Jakarta Urged to Enhance Power Outage Mitigation System

    access_time27-04-2026 remove_red_eye547 personFakhrizal Fakhri