You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Delapan Bak Kontrol di Pulau Pari Rampung

Channel Control Box Improvement on Jalan Pari Raya Completed

Seribu Island Water Resource Sub-agency has completed the improvement of eight water channel control box on Jalan Pari Raya, RT 03/04, Pari Island Urban Village, Seribu Selatan Island Sub-district.

was started since February 2024

Seribu Island Water Resource Sub-agency Head, Hendri, said five personnel were deployed to run the improvement such as for replacing the box cover.

Damaged Manhole Cover at Pasar Minggu Underpass Repaired

"The improvement was started since February 2024 and is completed now," he said Wednesday (3/6).

Hendri explained that the box control size is 80x80 cm with 30 cm of depth. Later, the personnel will also repaint the control box.

"It is hoped the improvement will optimize channel function as well as give comfort for road users, including tourists," he added.

Meanwhile, one of RW 04 residents, Pari Island Urban Village, Yadi (43), admitted the water was often overflow since the cover was damage.

"We appreciate the improvement since it will give us safety especially for children," he admitted.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
close