You don't have javascript enabled. Good luck with that.
Pencarian
Pengurasan Saluran PHB Rawabuaya Tuntas Dilakukan
....
photo TP Moan Simanjuntak - Beritajakarta.id

Channel Dredging on Jalan Outer Ring Road Completed

West Jakarta Water Resource Sub-agency has completed connecting water channel dredging on Jalan Outer Ring Road, RW 01, Rawa Buaya Urban Village, Cengkareng Sub-district.

will be able to anticipate inundation during heavy rain

Sub-agency Head, Purwanti, admitted the channel dredging was conducted along 150 meters.

"It was completed on Sunday (3/10) and it took four months," she said, Wednesday (3/13).

Water Channel on Jalan Puri Kembangan Dredged

According to her, the dredging involved 12 personnel to dredge 40-50 cm of depth.

It is hoped the dredging will accommodate more water and smoothly flow to Mookervart River.

Achmad Santoso (36), resident of Rawa Buaya Flat, RT 14/01, Rawa Buaya Urban Village, thanked to the personnel for completing the dredging of channel on Jalan Outer Ring Road.

"Hopefully the dredging will be able to anticipate inundation during heavy rain," he hoped.

Linked News
Popular News indeks
  1. Rano: Pancasila is the Big House for Indonesia's Diversity

    access_time02-06-2025 remove_red_eye526 personBudhi Firmansyah Surapati
  2. Transjabodetabek Bogor–Blok M Route and Corridor 13 Extension Begin Operations

    access_time05-06-2025 remove_red_eye396 personDessy Suciati
  3. Friendly Countries' Ambassadors Participate in Famtrip to Seribu Islands

    access_time05-06-2025 remove_red_eye390 personAldi Geri Lumban Tobing
  4. No Odd-Even Restrictions in Jakarta on June 6-9, 2025

    access_time03-06-2025 remove_red_eye271 personAldi Geri Lumban Tobing
  5. S. Jakarta Mayor: Idul Adha is a Moment to Enhance Compassion Among One Another

    access_time06-06-2025 remove_red_eye270 personTiyo Surya Sakti

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik