Channel Dredging on Jalan Outer Ring Road Completed
access_time March 13 2024 03:17 PM remove_red_eye 399
Reported by TP Moan Simanjuntak | Translated by Rizky Mawardi
Reported by TP Moan Simanjuntak | Translated by Rizky Mawardi
West Jakarta Water Resource Sub-agency has completed connecting water channel dredging on Jalan Outer Ring Road, RW 01, Rawa Buaya Urban Village, Cengkareng Sub-district.
will be able to anticipate inundation during heavy rain
Sub-agency Head, Purwanti, admitted the channel dredging was conducted along 150 meters.
"It was completed on Sunday (3/10) and it took four months," she said, Wednesday (3/13).
Water Channel on Jalan Puri Kembangan DredgedAccording to her, the dredging involved 12 personnel to dredge 40-50 cm of depth.
It is hoped the dredging will accommodate more water and smoothly flow to Mookervart River.
Achmad Santoso (36), resident of Rawa Buaya Flat, RT 14/01, Rawa Buaya Urban Village, thanked to the personnel for completing the dredging of channel on Jalan Outer Ring Road.
"Hopefully the dredging will be able to anticipate inundation during heavy rain," he hoped.