You don't have javascript enabled. Good luck with that.
Pencarian
Basuki Jamin Proyek MRT Tidak Terhenti Selama KTT Asia Afrika
.
photo Yopie Oscar - Beritajakarta.id

KAA, MRT Project Runs as Usual

The Asia Africa Summit which falls on April 19-24, 2015 will not interfere Mass Rapid Transit (MRT) project along Jl MH Thamrin. However, the project location will be closed up by tarp to  avoid the dust polluting the road.

No need to halt the construction, keep going on

Jakarta Governor Basuki  “Ahok” Tjahaja Purnama said the MRT project has not entering the deepest land drilling yet. Thus, it will not interfere the conference.

“It’s okay just close it up with tarp. No need to halt the construction, keep going on. Yet, several security officers will be placed there,” Ahok said at City Hall, Friday (4/17).

Djarot: Asia Africa Summit Readiness Already 90 Percent

He uttered, currently his party are preparing several things for instance painting of pedestrian bridge (JPO) and asphalting the roads.

“Due to rain often falls down lately, JPOs haven’t paint yet , soon it will be done,” he told.

Besides that, Ahok added there are still unfinished things to do such as the detail of decoration and banner in the delegation’s hotel have not installed yet.

Meanwhile to avoid city traffic congestion during the conference, city administration gives the traffic handling away to Polda Metro Jaya traffic unit and Mabes Polri.

“I asked them later,” he said.

For your information, as much as 18 of five-stars-hotels are being prepared for both the delegations and state leader’s inn. While LED lamps series will also be installed at the hotel.

Linked News
Popular News indeks
  1. Transjakarta Targets Planting 100,000 Mangroves

    access_time12-07-2025 remove_red_eye414 personBudhi Firmansyah Surapati
  2. Rano Karno Celebrates City's Anniversary with Kamal Residents

    access_time12-07-2025 remove_red_eye395 personFolmer
  3. Residents Enthusiastically Enjoy the Car Free Day in Kebayoran Lama

    access_time13-07-2025 remove_red_eye352 personTiyo Surya Sakti
  4. Traffic Engineering on Jalan Otista to Begin July 20 Due to JPO Revitalization

    access_time17-07-2025 remove_red_eye324 personAldi Geri Lumban Tobing
  5. MRT Jakarta Considers Route Expansion to South Tangerang

    access_time13-07-2025 remove_red_eye316 personAldi Geri Lumban Tobing

Hitung Mundur 22 Juni 2027

00
Hari
00
Jam
00
Menit
00
Detik