You don't have javascript enabled. Good luck with that.
Pencarian
Penataan Kawasan di Jalan Kelapa Dua Raya Capai 80 Persen

PPSU Personel Beautify Area on Jalan Kelapa Dua Raya

The second quarter area arrangement from April to June 2024 on Jalan Kelapa Dua Raya, RW 02, Kelapa Dua Urban Village, Kebon Jeruk Sub-district has reached 80 percent.

Today's work is targeted for completion within a week

Kelapa Dua Urban Village Head, Elfin Ridho Putra said the area arrangement, precisely on the west side of Jalan Panjang, was conducted by beautifying the 100-meter-long wall with various types of Betawi cultural murals such as typical Betawi houses and their ornaments, as well as Jakarta icons.

"Pots of various types of ornamental plants, one of which is palm trees, are also placed there," he expressed, Friday (6/7).

Utility Arrangement on Jalan Tanjung Duren Barat Daya Completed

The work involved ten personnel of PPSU. Even, previously, personnel had repaired sidewalks at the same location.

"Today's work is targeted for completion within a week," he added.

The action above received appreciation from one of the residents in RT 03/02 Kelapa Dua Urban Village, Yuliana Dewi. She admitted the wall was dull and had lots of graffiti.

"Now, by beautifying it with lots of colorful murals, the location is clean and beautiful," she stated.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close