You don't have javascript enabled. Good luck with that.
Pencarian
Pembuatan Saluran Jalan Kacang Tanah Raya Capai 40 Persen

Channel Performance in Rawa Buaya Optimized

The West Jakarta Water Resources Sub-agency (SDA) says the water channel construction is being built on Jalan Kacang Tanah Raya, RW 10, Rawa Buaya Urban Village, Cengkareng Sub-district. The work progress has touched 40 percent so far.

Thank you and hopefully it can minimize flooding in the rainy season

West Jakarta SDA Sub-agency Head, Purwanti said the channel along one kilometer was being widened from 40 to 60-100 centimeters, as well as using U-Ditch as high as one meter.

"This is done, as the channel was previously unoptimal and some points are damaged," she expressed, Wednesday (8/14).

Sidewalk Construction on Jalan Cakung Cilincing Completed

According to her, it would take up to 120 days, precisely from June 12 to October 9, 2024.

The work above received appreciation from a resident from RT 05.10, Rawa Buaya Urban Village, Santoso Pribadi (39).

"Thank you and hopefully it can minimize flooding in the rainy season," he said.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye415 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye359 personDessy Suciati
close