Channel Draining on Jalan Sadar IV Petojo Utara Completed
access_time September 02 2024 05:00 PM remove_red_eye 201
Reported by Budhi Firmansyah Surapati | Translated by Nugroho Adibrata
Reported by Budhi Firmansyah Surapati | Translated by Nugroho Adibrata
The channel draining located on Jalan Sadar IV RT 06/04, Petojo Utara Sub-district, Gambir, which has been underway since August 8, Sunday (8/31), finally completed.
Hopefully, it can minimize flooding in the future
Gambir Sub-district SDA Executing Unit Head, M Imawan said the draining is conducted to anticipate flooding in the rainy season.
"Every day, we deploy 12 personnel to the location," he expressed, Monday (9/2).
Dirty Channel on Jalan Bina Marga Drained from MudHe explained the channel is about 80 centimeters wide and 50 centimeters high with mud reaching 20 centimeters deep.
"In total, the channel long on two roadsides dredged is about 500 meters," he explained.
The work appreciation from one of the residents in RW 04, Petojo Utara Urban Village, Maulana.
"Hopefully, it can minimize flooding in the future," he hoped.