You don't have javascript enabled. Good luck with that.
Pencarian
 Pengurasan Saluran Jalan Sadar IV Petojo Utara Rampung

Channel Draining on Jalan Sadar IV Petojo Utara Completed

The channel draining located on Jalan Sadar IV RT 06/04, Petojo Utara Sub-district, Gambir, which has been underway since August 8, Sunday (8/31), finally completed.

Hopefully, it can minimize flooding in the future

Gambir Sub-district SDA Executing Unit Head, M Imawan said the draining is conducted to anticipate flooding in the rainy season.

"Every day, we deploy 12 personnel to the location," he expressed, Monday (9/2).

Dirty Channel on Jalan Bina Marga Drained from Mud

He explained the channel is about 80 centimeters wide and 50 centimeters high with mud reaching 20 centimeters deep.

"In total, the channel long on two roadsides dredged is about 500 meters," he explained.

The work appreciation from one of the residents in RW 04, Petojo Utara Urban Village, Maulana.

"Hopefully, it can minimize flooding in the future," he hoped.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye870 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye428 personFakhrizal Fakhri
  3. South Jakarta Tackles 38 Dengue Cases to Prevent Outbreak

    access_time02-02-2026 remove_red_eye425 personTiyo Surya Sakti
  4. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye372 personDessy Suciati
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye361 personDessy Suciati
close