You don't have javascript enabled. Good luck with that.
Pencarian
 Pengurasan Saluran Jalan Sadar IV Petojo Utara Rampung

Channel Draining on Jalan Sadar IV Petojo Utara Completed

The channel draining located on Jalan Sadar IV RT 06/04, Petojo Utara Sub-district, Gambir, which has been underway since August 8, Sunday (8/31), finally completed.

Hopefully, it can minimize flooding in the future

Gambir Sub-district SDA Executing Unit Head, M Imawan said the draining is conducted to anticipate flooding in the rainy season.

"Every day, we deploy 12 personnel to the location," he expressed, Monday (9/2).

Dirty Channel on Jalan Bina Marga Drained from Mud

He explained the channel is about 80 centimeters wide and 50 centimeters high with mud reaching 20 centimeters deep.

"In total, the channel long on two roadsides dredged is about 500 meters," he explained.

The work appreciation from one of the residents in RW 04, Petojo Utara Urban Village, Maulana.

"Hopefully, it can minimize flooding in the future," he hoped.

Linked News
Popular News indeks
  1. Jakarta Government Guarantees Full Medical Care for Bantargebang Landslide Victims

    access_time09-03-2026 remove_red_eye1296 personDessy Suciati
  2. Commission E Supports Restricting Children's Access to Social Media

    access_time09-03-2026 remove_red_eye1128 personFakhrizal Fakhri
  3. Affordable and High-Quality Staple Goods Offered at Ramadan Bazaar

    access_time09-03-2026 remove_red_eye839 personAldi Geri Lumban Tobing
  4. Jakarta Planetarium Rolls Out Varied Shows for Eid al-Fitr Holiday

    access_time11-03-2026 remove_red_eye290 personAldi Geri Lumban Tobing
  5. Jakarta Speeds Up Flood Mitigation Efforts

    access_time08-03-2026 remove_red_eye288 personAldi Geri Lumban Tobing