You don't have javascript enabled. Good luck with that.
Pencarian
 Normalisasi Saluran di Jalan Danau Danplas Rampung

Channel Normalization on Jalan Danau Danplas Completed

The Central Jakarta Water Resources Sub-agency (SDA), completed the normalization work of a 100-meter-long channel on both sides of Jalan Danau Danplas, RT 18/04, Bendungan Hilir Urban Village, Tanah Abang, Monday (9/23).

We replace the channel structure with U-ditch

Tanah Abang Sub-district SDA Executing Unit Head, Eli Menawan Sari said that the normalization was done, because personnel found many parts of the sheet pile's walls damaged and collapsed.

"We replace the channel structure with U-ditch," she expressed, Tuesday (9/24).

Water Channel on Jalan Teluk Gong Normalized

She explained it has been ongoing since Thursday (8/15) which involved ten personnel.

The work above received appreciation from one of the residents from RW 04, Bendungan Hilir Urban Village, Rahmat.

"Hopefully, it can minimize flooding when it rains, especially heavy rain," he hoped.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1367 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1033 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye958 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye771 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye734 personAldi Geri Lumban Tobing