You don't have javascript enabled. Good luck with that.
Pencarian
 Pembuatan Turap Anak Kali Semanan di Duri Kosambi Capai 80 Persen
.
photo TP Moan Simanjuntak - Beritajakarta.id

Semanan River Plaster Construction in Duri Kosambi Reaches 80 Percent

West Jakarta Water Resources Sub-agency constructs Semanan River plaster at Duri Kosambi Baru Housing Complex, RT 02/02, Duri Kosambi, Cengkareng.

to prevent erosion

West Jakarta Water Resources Sub-agency Head, Purwanti said the plaster construction is applied on both sides by 193 meter-long and three meter width each.

"The construction is a continuation project to prevent erosion and flow the water smoothly," she said, Friday (11/29).

Orange Personnel Clean Collapsed Plaster Material on Jalan Birah III

According to her, the construction has been running since April 24, 2024 by involving 12 personnel.

"Now the work has reached 80 percent and is targeted to complete next month," she added.

Meanwhile, Jhon Herry (45), Duri Kosambi Housing Complex security officer, supports the plaster construction.

"Local residents support the plaster construction. It can prevent erosion and make environment tidier," he admitted.

Linked News
Popular News indeks
  1. Commission D Legislator Supports Park Monitoring Optimization

    access_time20-01-2025 remove_red_eye1502 personDessy Suciati
  2. Realizing Food Self-Sufficiency, Jakarta Holds Simultaneous Planting Activity

    access_time21-01-2025 remove_red_eye923 personAldi Geri Lumban Tobing
  3. Residents Flock to Cheap Bazaar at Cilandak Timur Urban Village Office

    access_time15-01-2025 remove_red_eye770 personTiyo Surya Sakti
  4. City and Kejati Forge Cooperation for Good Government Governance

    access_time21-01-2025 remove_red_eye387 personFolmer
  5. 13 Inter-village Bridges in South Jakarta Revitalized

    access_time16-01-2025 remove_red_eye366 personTiyo Surya Sakti