You don't have javascript enabled. Good luck with that.
Pencarian
Transjakarta Perpanjang Layanan Ke Empat Terminal Sambut Nataru 2024

Integrated Nataru Post at Pulogebang Bus Terminal Operated

The Pulogebang Integrated Bus Terminal, Cakung, East Jakarta, has operated the Integrated Post of Christmas and New Year (Nataru)Holiday since Wednesday (12/18). The post will be operated up to January 5, 2025.

The post is prepared on the second floor of departure lane

Pulogebang Integrated Bus Terminal Squad Commander, Badman Harahap said the post has been prepared since a week ago to anticipate passenger surge that is predicted to start today, Friday (12/20).

Transjakarta Extends Service Hours to Four Terminals during Christmas

"The post is prepared on the second floor of departure lane. The post will assist the safety and comfort for the homecomers," he said.

Badman added that personnel will standby on the post at 7 AM-2 PM, 2 PM-9 PM, and 9 PM-7 AM.

As many as 70 joint personnel will standby on the post in each shift. Those are security officers, operational officers, tariff administrators, technicians, cleaning services and Army/Police.

"Personnel from Polda Metro Jaya and Kodam Jaya will join with he existing personnel," he added.

Badman appealed the passengers to be more careful in carrying their belongings. Do not let the belongings be left or swapped.

Passengers are able to take the belongings if they left it at the terminal or on the bus. The belongings will be stored on the terminal's second floor of arrival and departure lanes.

Passengers should show their ID card, type of the belongings, tell the destination and name the bus to the officer before taking the belonging back.

"The procedures are to ensure that the belongings are taken by the real owner," he stated.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1687 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1473 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1332 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1111 personDessy Suciati
  5. The Pegangsaan Dua-Manggarai LRT Project Reaches 95 Percent Completion

    access_time14-07-2026 remove_red_eye803 personDessy Suciati