You don't have javascript enabled. Good luck with that.
Pencarian
Enam Sumur Resapan Dibangun di Pulau Tidung

Six Infiltration Wells Built on Tidung Island to Face Rainy Season

The Seribu Islands Water Resources Sub-agency (SDA) is building six infiltration wells in the residential environment of RW 03 residents, Tidung Island Urban Village, South Seribu Islands.

It is targeted to be completed on July 9, 2025

Seribu Islands SDA Sub-agency Head, Mustajab said, the well was being built in RT 03, 04, and 05.

"Each RT will has two wells. This is done to anticipate flooding when it rains," he expressed, Monday (7/7).

Seribu Island Blue Taskforce Personnel Handle Inundation on Pramuka Island

As the initial stage, his team was building a drainage tank with 60 centimeters long, 40 centimeters wide, and 60 centimeters deep.

He added, those wells would be connected between one tank with another tank using a six -inch paralon pipe with 87.5 meters long.

"Previously we did the excavation first for the drainage tank. Then, it connected to the paralon and later the well will be closed manually," he explained.

This work has been ongoing since July 2, 2025, involving seven personnel.

"It is targeted to be completed on July 9, 2025. This well is one of our concrete steps in improving environmental infrastructure and drainage systems on residential islands," he added.

The work received appreciation from RT 04/03 Chairman, Tidung Island Urban Village, Nuraini.

"Very happy because the aspirations of residents are quickly responded by the local government. Alhamdulillah (thank God),hope this well can minimize flooding when it rains heavily or rob (tidal wave)," he closed.

Linked News
Popular News indeks
  1. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye974 personAldi Geri Lumban Tobing
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye934 personAldi Geri Lumban Tobing
  3. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye836 personFakhrizal Fakhri
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye710 personAldi Geri Lumban Tobing
  5. Chinese New Year Holiday, Ancol Flocked by Visitors

    access_time16-02-2026 remove_red_eye608 personAnita Karyati