You don't have javascript enabled. Good luck with that.
Pencarian
PPSU Bangun Empat Sumur Resapan di Setu

12 PPSU Personnel Construct Infiltration Wells in Setu Urban Village

As many as four infiltration wells are constructed by Setu Urban Village PPSU personnel, Cipayung, East Jakarta at Tipul Alley, RT 06/03. Infiltration wells are constructed to solve inundation in the area.

It is hoped the infiltration wells are able to solve inundation

Cipayung Sub-district Head, Panangaran Ritonga, said the infiltration well construction is part of area arrangement program in the area. It is also to reach 200 infiltration wells target.

Four Infiltration Wells in Tidung Island to Complete Soon

"It is hoped the infiltration wells are able to solve inundation in the area," Ritonga said, Friday (7/5).

Setu Urban Village Head, Dwi Widiastuti, explained the construction of this infiltration well was the result of synergy with residents. Residents prepared all the materials to provide them. Meanwhile, her party is preparing drilling machines and PPSU personnel.

"The four infiltration wells have an average depth of 20 meters. The target is to complete the work next week," she explained.

Meanwhile, RT 06/03 Setu Head, Syaripuloh, admitted the area is often inundated by around 50 cm during heavy rain since the existing channel is not able to flow the water. The existing channel was constructed individually by residents and only has 25-30 cm of width.

"This condition lasts for 15 years. Now the infiltration wells are constructed here," he admitted.

Linked News
Popular News indeks
  1. Attending Betawi Eid 2026, Pram Encourages Strengthening Cultural Values

    access_time11-04-2026 remove_red_eye1107 personFolmer
  2. Low Emission Zones: Jakarta’s Concrete Step to Curb Air Pollution

    access_time13-04-2026 remove_red_eye1059 personAldi Geri Lumban Tobing
  3. Pademangan Health Center Promotes 3M Plus to Prevent Dengue Fever

    access_time14-04-2026 remove_red_eye776 personAnita Karyati
  4. Jakarta Provincial Government Fully Supports BTN JAKIM 2026

    access_time14-04-2026 remove_red_eye688 personDessy Suciati
  5. Transjakarta Adjusts Route 6D Tebet Station-Bundaran Senayan

    access_time14-04-2026 remove_red_eye519 personAldi Geri Lumban Tobing