You don't have javascript enabled. Good luck with that.
Pencarian
 Tangani Banjir, Pramono Tinjau Pengerukan Kali Irigasi Bekasi Tengah

Pramono Checks Progress on Bekasi Tengah Irrigation Canal Dredging

Jakarta Governor Pramono Anung inspected the Bekasi Tengah Irrigation Canal in Cakung, East Jakarta, on Monday (7/7) to ensure that flood control and water management efforts in the area are running optimally.

"...it is a top priority,"

Pramono stated that dredging canals, especially in border areas, is one of the top priorities in addressing flooding in Jakarta.

40 RTs in Jakarta Reportedly Still Inundated

"The point is, I have decided that dredging along the outskirts of Jakarta must be carried out immediately, as it is a top priority," he emphasized.

He explained that the irrigation canal was originally built by the central government to prevent flooding and provide a water source. Over time, however, the responsibility for its maintenance shifted to the Jakarta Provincial Government to address recurring flood issues.

The dredging of Bekasi Tengah Irrigation Canal in Cakung spans 5.3 kilometers, passing through three urban villages, namely Ujung Menteng, Cakung Timur, and Cakung Barat. It falls under the Citarum River Basin Development Authority.

In 2025, several dredging activities are planned along the Bekasi Tengah Irrigation Canal or PAM inspection. These include dredging Segment A, from East Flood Canal to Metland Ujung Menteng housing gate. 

This dredging was carried out from February 12 to May 19, 2025, by removing a total volume of 5,753 cubic meters of sediment over 1,100 meters in length.

Dredging for Segment B, from Metland housing gate to Cakung Drain River, is currently underway. It is expected to remove 10,147 cubic meters of sediment over a 4,200-meter stretch.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye715 personDessy Suciati
  2. New LapakMain Corner Creative Hub Inaugurated at Tunas Muda RPTRA, Kramat Pela

    access_time05-08-2026 remove_red_eye599 personTiyo Surya Sakti
  3. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye540 personAldi Geri Lumban Tobing
  4. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye504 personFakhrizal Fakhri
  5. Thousand Islands Conducts Vehicle Emission Tests on Three Islands

    access_time07-08-2026 remove_red_eye490 personAnita Karyati