You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Sauran Air di Kelapa dua Wetan Ditarget Rampung Akhir Juli

Water Channel Repair on Jalan Dahlia Reaches 85 Percent

Ciracas District's Water Resource Unit personnel run the water channel improvement on Jalan Dahlia, RT 08/05, Kelapa Dua Wetan Urban Village. Now the progress has reached 85 percent.

The area was often inundated

Ciracas District's Water Resource Unit Head, Yulia Indah said seven personnel are deployed to improve the channel along 22 meters.

Commission D Pushes for Development of Flood Control Infrastructure Acceleration

"The channel improvement is run based on resident's request," he said, Monday (7/28).

According to him, the work is run manually since July 21 and is targeted to completed next month.

He hopes that with these improvements, the channel's function will be more optimal in preventing potential flooding because its capacity will also be increased.

Kelapa Dua Wetan Urban Village Secretary, Akhmad Bakri stated the existing condition of the water channel was only 20 centimeters wide with a lot of sedimentation.

"The area was often inundated when heavy rain falls. Hopefully the channel improvement will eliminate it fully," he stated.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1384 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye1014 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye845 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye652 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye634 personAldi Geri Lumban Tobing