You don't have javascript enabled. Good luck with that.
Pencarian
 Tim Gabungan Tinjau Turap Longsor di Kali Cipinang

Collapsed Retaining Wall of Cipinang River in Cibubur Repaired

The collapsed retaining wall of Cipinang River in Cibubur Urban Village, Ciracas District, East Jakarta will be repaired.

The repair must be run soon

As the early stage, the ranks of Ciracas District together with Cimanggis District, Depok, West Java, inspected the area today.

Ciracas District Secretary, Abdul Khair said the collapsed retaining wall length reached more than 73 meters.

Gubug Genteng Phb Channel Retaining Wall Repair Reaches 75 Percent

"Cipinang River is under the jurisdiction of the central government, or BBWSCC. We'll submit proposal for this repair," he said, Tuesday (8/5).

He hopes the repair can be started soon since the location is near with the residential of RW 14, Cibubur Urban Village.

"The repair must be run soon to avoid overflow water inundate the residential during heavy rain," he added.

Meanwhile, Ciracas District's Water Resource Taskforce Coordinator, Deby stated the repair will be run by Jakarta Water Resource Agency.

"We remain in coordination stage to realize the repair," he stated.

Linked News
Popular News indeks
  1. Jakarta Claims Rp 2.27 T in Public Assets from Developer Obligations

    access_time06-08-2026 remove_red_eye750 personDessy Suciati
  2. Abdul Muis Building Fire Response Nears Completion, No Fatalities Reported

    access_time08-08-2026 remove_red_eye577 personAldi Geri Lumban Tobing
  3. Jakarta Ensures Public Services Stay Operational After Abdul Muis Building Fire

    access_time08-08-2026 remove_red_eye542 personFakhrizal Fakhri
  4. Pramono Urges MUI to Strengthen Synergy in Maintaining Jakarta’s Harmony

    access_time12-08-2026 remove_red_eye528 personDessy Suciati
  5. Jakarta Remains Indonesia's Top Investment Destination

    access_time07-08-2026 remove_red_eye514 personAldi Geri Lumban Tobing