You don't have javascript enabled. Good luck with that.
Pencarian
 Tim Gabungan Tinjau Turap Longsor di Kali Cipinang

Collapsed Retaining Wall of Cipinang River in Cibubur Repaired

The collapsed retaining wall of Cipinang River in Cibubur Urban Village, Ciracas District, East Jakarta will be repaired.

The repair must be run soon

As the early stage, the ranks of Ciracas District together with Cimanggis District, Depok, West Java, inspected the area today.

Ciracas District Secretary, Abdul Khair said the collapsed retaining wall length reached more than 73 meters.

Gubug Genteng Phb Channel Retaining Wall Repair Reaches 75 Percent

"Cipinang River is under the jurisdiction of the central government, or BBWSCC. We'll submit proposal for this repair," he said, Tuesday (8/5).

He hopes the repair can be started soon since the location is near with the residential of RW 14, Cibubur Urban Village.

"The repair must be run soon to avoid overflow water inundate the residential during heavy rain," he added.

Meanwhile, Ciracas District's Water Resource Taskforce Coordinator, Deby stated the repair will be run by Jakarta Water Resource Agency.

"We remain in coordination stage to realize the repair," he stated.

Linked News
Popular News indeks
  1. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1311 personAldi Geri Lumban Tobing
  2. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1226 personAldi Geri Lumban Tobing
  3. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye1037 personFolmer
  4. Pramono Launches Jumbo Biopores, Aims for Jakarta Waste Management Blueprint

    access_time07-06-2026 remove_red_eye966 personDessy Suciati
  5. Pram Inaugurates Matraman Health Center, Calls for Seamless Public Service

    access_time05-06-2026 remove_red_eye796 personDessy Suciati