You don't have javascript enabled. Good luck with that.
Pencarian
 Tim Gabungan Tinjau Turap Longsor di Kali Cipinang

Collapsed Retaining Wall of Cipinang River in Cibubur Repaired

The collapsed retaining wall of Cipinang River in Cibubur Urban Village, Ciracas District, East Jakarta will be repaired.

The repair must be run soon

As the early stage, the ranks of Ciracas District together with Cimanggis District, Depok, West Java, inspected the area today.

Ciracas District Secretary, Abdul Khair said the collapsed retaining wall length reached more than 73 meters.

Gubug Genteng Phb Channel Retaining Wall Repair Reaches 75 Percent

"Cipinang River is under the jurisdiction of the central government, or BBWSCC. We'll submit proposal for this repair," he said, Tuesday (8/5).

He hopes the repair can be started soon since the location is near with the residential of RW 14, Cibubur Urban Village.

"The repair must be run soon to avoid overflow water inundate the residential during heavy rain," he added.

Meanwhile, Ciracas District's Water Resource Taskforce Coordinator, Deby stated the repair will be run by Jakarta Water Resource Agency.

"We remain in coordination stage to realize the repair," he stated.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1365 personFakhrizal Fakhri
  2. Transjakarta Brings Lunar New Year Festivities to Public Transport

    access_time16-02-2026 remove_red_eye1030 personAldi Geri Lumban Tobing
  3. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye958 personAldi Geri Lumban Tobing
  4. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye769 personAldi Geri Lumban Tobing
  5. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye733 personAldi Geri Lumban Tobing