You don't have javascript enabled. Good luck with that.
Pencarian
Petugas sedang menguras saluran air di Jalan Awaludin IV

Water Channel Dredging on Jalan Awaludin IV Completes

Eight blue taskforce personnel of Central Jakarta Water Resources Sub-agency has completed the channel dredging on Jalan Awaludin IV, RW 17, Kebon Melati, Tanah Abang.

The area was often inundated

Head of Tanah Abang District Water Resource Unit, Eli Menawan Sari said her rank has completed the channel dredging besides local district office.

"The dredging was run based on our monitoring. The area was often inundated during heavy rain," she said, Monday (9/8).

Water Channel in Bidara Cina Revitalized to Prevent Flooding

She added that her side also completed the channel dredging on Jalan KH Mas Mansyur.

"The total length of the dredged channel is approximately 150 meters with a width of 60 centimeters and the thickness of the dredged mud is approximately 30 centimeters," she explained.

Santo (45), resident of RW 17, Kebon Melati appreciated the inundation handling by dredging the channel.

"Now the area is free of inundation," he admitted.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye819 personTiyo Surya Sakti
  2. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye749 personNurito
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye658 personTiyo Surya Sakti
  4. Jakarta to Host Lebaran Betawi Next Week at Lapangan Banteng

    access_time03-04-2026 remove_red_eye495 personFakhrizal Fakhri
  5. Pramono Ensures Treatment for Students Victims of MBG is Well-Managed

    access_time04-04-2026 remove_red_eye457 personDessy Suciati