You don't have javascript enabled. Good luck with that.
Pencarian
Petugas sedang menguras saluran air di Jalan Awaludin IV

Water Channel Dredging on Jalan Awaludin IV Completes

Eight blue taskforce personnel of Central Jakarta Water Resources Sub-agency has completed the channel dredging on Jalan Awaludin IV, RW 17, Kebon Melati, Tanah Abang.

The area was often inundated

Head of Tanah Abang District Water Resource Unit, Eli Menawan Sari said her rank has completed the channel dredging besides local district office.

"The dredging was run based on our monitoring. The area was often inundated during heavy rain," she said, Monday (9/8).

Water Channel in Bidara Cina Revitalized to Prevent Flooding

She added that her side also completed the channel dredging on Jalan KH Mas Mansyur.

"The total length of the dredged channel is approximately 150 meters with a width of 60 centimeters and the thickness of the dredged mud is approximately 30 centimeters," she explained.

Santo (45), resident of RW 17, Kebon Melati appreciated the inundation handling by dredging the channel.

"Now the area is free of inundation," he admitted.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1395 personFakhrizal Fakhri
  2. Free Transit Card Applications Skyrocket 143%, Passing 76k Mark

    access_time20-02-2026 remove_red_eye990 personAldi Geri Lumban Tobing
  3. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye865 personAldi Geri Lumban Tobing
  4. Public Works Agency Gets Transjakarta Corridor 13 Back in Tip-Top Shape

    access_time17-02-2026 remove_red_eye755 personAldi Geri Lumban Tobing
  5. Jalan RS Fatmawati Widening Supports Transit-Oriented Development

    access_time19-02-2026 remove_red_eye712 personTiyo Surya Sakti